background image

I-1048 

 

Page 2 of 7 

Rev. A-39406      11/27/13 

 
 

Specifications 

 
Packing List 

DEMA 

NO. 

SQUIRT 

DC DRAIN 

UNIT 

CABLE 

TIES (8) 

¼” TUBING 

SPLIT 

PICK UP 

TUBE 

SQUEEZE TUBE 

2504 25-220-1  81-16-3  25-68-20 (LDPE) 

81-312-1 

81-231-1 

 (EPDM, JACO) 

2505 25-220-1  81-16-3 

25-160-20 (SUPER 

TUBE) 

81-312-1 

81-231-4 

(EPDM, CONE) 

 
Operational Requirements 

For indoor use only 

Main Power  

 (8) D-CELL BATTERIES (NOT INCLUDED) 

Case Material 

ABS 

Product Weight 

1.18 kg 

2.60 lbs. 

The integrity and operational characteristics of this unit are not guaranteed 

outside the above mentioned parameters. Use of this unit outside of these 

parameters nullifies warranty. 

 
 

Overall Size 

 

 
 
 
 
 
 
 
 
 
 

Содержание SQUIRT DC

Страница 1: ...l city county parish provincial or other agencies It is possible that electrical codes and regulations require that a certified electrical contractor or engineer perform the electrical installation Fo...

Страница 2: ...JACO 2505 25 220 1 81 16 3 25 160 20 SUPER TUBE 81 312 1 81 231 4 EPDM CONE Operational Requirements For indoor use only Main Power 8 D CELL BATTERIES NOT INCLUDED Case Material ABS Product Weight 1 1...

Страница 3: ...44 116 2 8 X 3 8 HI LO SCREW 8 81 18 1 6 X 3 8 HI LO SCREW 9 83 16 2 VELCRO PATCH Installation Mount the unit no higher than 6 feet from the chemical container Take into account the proximity to the c...

Страница 4: ...sure to push the pump head on tightly so that the tab is grasping the pump head If the tab is not fully engaged there is a possibility the pump head becoming dislodged Correct Incorrect Operation Prog...

Страница 5: ...events can be programmed 1 Press and release the TIMER button to enter the programming mode The event number will be in the bottom left corner Note To program a full event a pump start time and stop...

Страница 6: ...ck up tubing is not sealed to the squeeze tube fitting 1 Check the tubing from the chemical container to the pump head for leaks by feeling the tubing for chemical that has leaked out Replace the tube...

Страница 7: ...fective units or parts should be returned to the factory with transportation prepaid If inspection shows them to be defective they will be repaired or replaced without charge F O B factory DEMA assume...

Отзывы: