2-6
2-3 Cabinet Installation
SVG300AXXA-11/SVG500AXXA-11
;
Before beginning installation, please check the appearance of the model and confirm there is no
visible damage. Please follow the installation instructions in the manual to ensure the safety of
both the product and personnel.
;
When taking out the cabinet from the carton, please note whether the base-fixing iron plates
(L-shaped iron plates) need to be used in conjunction. If the base-fixing iron plates are not
needed, they can be left on the carton's base when taken out (as shown in figure 1-8(b)).
;
When installing the cabinet, make sure it is installed in a place that is well ventilated and
dust-free. Do not let any fiber, paper scraps, sawdust, metal scraps, or other foreign objects
enter the Static VAR Generator or become attached to the cooling fans, as this will cause the
Static VAR Generator to not operate properly.
;
When installing the cabinet, the cooling distances are shown in figures 2-1a &2-1b.
1.
Head space: To ensure that the model achieves an Ingress Protection rating of IP54, the
shortest distance for the space reserved for the replacement of the fans must be
at least 400mm (15.75 inches).
2.
Back space: If the user's installation requires wires coming in from the top, enough space
must be reserved behind the cabinet for the power cable to come in. The
shortest distance must be at least 200mm (7.87 inches).
3.
Side space: The cabinet door opens from left to right, therefore the side of the cabinet
cannot be placed directly against a wall; some space must be left on the side
for the doors to open. The shortest distance from the side to the wall must be at
least 275mm (10.83 inches), and the door must be able to open to at least
120°.
SVG300&SVG500
Top s pac e
≥
400mm
(15.75")
Bac k s pac e
≥
200mm
(7.87")
IP54
IP21/IP54
Figure 2-1a
Содержание SVG300A43A-11
Страница 1: ...6...
Страница 3: ...II NOTE 90 10 45 SVG300AXXA XX 10 40 SVG500AXXA XX CT K S1 L S2 CT CT CT SVG SVG...
Страница 6: ...1 2 1 2 90 1 3 SVG SVG SVG300A43A 11 1 10...
Страница 7: ...1 3 2 EPE 4 1 5 1 6 2 1 5 1 6 3 1 7 a M5 12 1 7 b M5 8 4 1 8 a b 1 3 3 1 8 a L...
Страница 8: ...1 4 1 8 b 5 2 3 1 7 a 1 7 b 1 8 a 1 8 b...
Страница 11: ...2 2 2 1 2 SVG300AXXA XX SVG500AXXA XX a b c d a 1 3 3 b 04 c 2 2 1 d...
Страница 17: ...2 8 2 5 SVG300 mm inch...
Страница 20: ...2 11 2 7...
Страница 21: ...2 12 55mm 2 16in 63 6mm 2 50in 63 6mm 2 50in 100mm 3 94in 2 8...
Страница 26: ...2 17 Note 14 CT 2 16 a b P1 P2 CT CT 2 4 1 DeltaSVG P1 P2 K1 S1 L1 S2 2 16 a Delta SVG P1 P2 K1 S1 L1 S2 2 16 b...
Страница 31: ...3 2...
Страница 41: ...4 1 04 15 15 800 600 TFT LCD 100 SD 10 10 4 3 1 4 1 4 1 1 4 1 2 1 2 3 1 2 3 2...
Страница 42: ...4 2 APFXXXA43X XX A Hz 1 4 3 or ON OFF 2 3 4 2 4 2 1 4 2 2 4 2 2 1 4 3...
Страница 44: ...4 4 4 2 2 7 HELP HELP CT 6...
Страница 45: ...4 5 CT 4 2 3 4 1 2...
Страница 46: ...4 6 4 3 4 3 1 CT 20120123 1 2 3 CT CT CT CT P1 P2 P2 P1 CT CT CT...
Страница 47: ...4 7 4 5 4 3 2 1 2 1 5 30 60 3 USB or SD Card...
Страница 48: ...4 8 4 3 3 1 2 1 5 0 1 4 4 3 4 20120123 1 20120123 10 2...
Страница 50: ...4 10 4 20120123 5 Save Quit X 10 10 120...
Страница 51: ...4 11 6 03 4 3 5 20120123...
Страница 52: ...4 12 1 20120123 2 20120123 3 20120123...
Страница 53: ...4 13 4 5 4 3 6...
Страница 54: ...4 14 1 200 2 20120123 3 20120123...
Страница 55: ...4 15 4 20120123 5...
Страница 56: ...5 1 5 5 1 SVG 4 3 5 200 1 2 10 R S T CT...
Страница 57: ...5 2 IGBT CT RESET...
Страница 58: ...5 3 RESET CT CT CT HMI IGBT...
Страница 78: ...2 10 Figure 2 5 The two side boards and removal method SVG300 Unit mm inch...
Страница 81: ...Product Installation 2 13 Figure 2 7...
Страница 112: ...8 Model Settings CT Settings Operation Time...