8
Operation and installation manual SOLIVIA 5.0 AP G3
5
Installation
Installation and commissioning must only be carried out by qualified electrical experts.
The recommended local and national safety regulations and the technical interface conditions (TAB
2000), should be complied with.
To carry out an energy measurement, a meter must be attached between the grid feed-in point and
the solar inverter (in accordance with all local and national safety regulations).
By means of the integrated anti-islanding protection, the function of the recommended section
switch is fulfilled in accordance with all local and national safety regulations.
For details, please refer to § 9.
Caution: The secondary short-circuit current rating is increased at the transfer connection point to
the public electricity supply system by the nominal current of the connected solar inverter.
6
Installation of equipment
6.1
Installation location
• Install the device on a non-flammable support base.
• Avoid installation on resonating bodies (light construction walls etc.).
• Installation is possible both indoors and in protected outdoor areas.
• An increased ambient temperature can reduce the efficiency of the PV system.
• Noise generation is possible (avoid installation in residential areas).
• Ensure legibility of the LEDs and the display (check read-off angle and installation height).
• Although the unit is fitted with UV resistant components, direct exposure to sunlight should be
avoided.
• Despite having an IP65 enclosure and being certified in accordance with soiling category III, the
unit must not be allowed to become heavily soiled.
• Dusty conditions can impair the unit’s performance.
6.2
Minimum requirements
• Free convection around the solar inverter must not be impaired.
• For proper air circulation to dissipate heat, allow a clearance of approx. 10 cm to the side and
approx. 50 cm above and below the unit.
• The grid impedance requirement at the supply terminal is to be observed (cable length, cable
cross-section).
• The recommended installation position is to be adhered to (vertical).
• Unused DC connectors and interfaces must be sealed airtight with sealing plugs to ensure
protection class IP65 for the whole system (inverter & cables).
50 cm
10 cm
50 cm
10 cm
Wall
Wall
Содержание SOLIVIA 5.0 AP G3
Страница 1: ...Operation and installation manual for SOLIVIA 5 0 AP G3 5 0 AP...
Страница 2: ......
Страница 4: ...2 Operation and installation manual SOLIVIA 5 0 AP G3...
Страница 38: ...36 SOLIVIA 5 0 AP G3...
Страница 39: ...37 SOLIVIA 5 0 AP G3 Delta Energy Systems Germany GmbH Delta Energy Systems www solar inverter com...
Страница 40: ...38 SOLIVIA 5 0 AP G3...
Страница 42: ...40 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 AC 2 SOLIVIA 5 0 AP G3 9 18kg 5...
Страница 43: ...41 SOLIVIA 5 0 AP G3 3 12 IP65 4 MPP 4 1 PC...
Страница 44: ...42 SOLIVIA 5 0 AP G3 4 2 DC AC MPP MPP 150V 450V 540 VDC IP65 25 C 60 C RS485 EMC 4 6kVA...
Страница 45: ...43 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED 1 4 5 2 3...
Страница 46: ...44 SOLIVIA 5 0 AP G3 5 TAB 2000 9 6 6 1 LED IP65 III 6 2 10cm 50cm DC IP65 50 cm 10 cm 50 cm 10 cm Wall Wall...
Страница 47: ...45 SOLIVIA 5 0 AP G3 319 5 150 320 200 6 5 12 12 5 90 38 12 410 0 5 6 3 6 4 1 6mm 8 4 2 32 0kg 3 4 5...
Страница 53: ...51 SOLIVIA 5 0 AP G3 6 9 MPP DC DC DC DC DC A AC B C D 51 SOLIVIA 5 0 AP G3...
Страница 68: ...66 SOLIVIA 5 0 AP G3 10 10 1 400 220V 400 230 V VNB Z 1 Z 2 1 2 400 220 V 400 230 V 4 6kVA...
Страница 69: ...67 SOLIVIA 5 0 AP G3 400 220V 400 230 V VNB Z 1 Z 2 1 2 3 400 220 V 400 230 V 4 6kVA...
Страница 71: ...69 SOLIVIA 5 0 AP G3 DC 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Страница 73: ...71 SOLIVIA 5 0 AP G3 RJ45 8 RJ Registered Jack RS485 EIA485 DC AC TAB 2000 TAB 2000 2000 DSO...
Страница 74: ...72 SOLIVIA 5 0 AP G3...
Страница 75: ...73 SOLIVIA 5 0 AP G3 www solar inverter com Delta Energy Systems Germany GmbH Delta Energy Systems...
Страница 76: ...74 SOLIVIA 5 0 AP G3...
Страница 78: ...76 SOLIVIA 5 0 AP G3 1 SOLIVIA 5 0 AP G3 2 SOLIVIA 5 0 AP G3 9 18 5...
Страница 79: ...77 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 MPP Tracking 150V 450V 540V IP65 25 C 60 C...
Страница 80: ...78 SOLIVIA 5 0 AP G3 4 3 1 2 3 RS485 EIA485 4 5 LED RS485 EMC 4 6 kVA 4 3 1 4 5 2 3...
Страница 81: ...79 SOLIVIA 5 0 AP G3 5 TAB 2000 9 6 6 1 LED IP65 6 2 10 50 Tyco IP65 50 cm 10 cm 50 cm 10 cm Wall Wall...
Страница 82: ...80 SOLIVIA 5 0 AP G3 319 5 150 320 200 6 5 12 12 5 90 38 12 410 0 5 6 3 6 4 1 6 4 8 2 32 0 3 4 5...
Страница 87: ...85 SOLIVIA 5 0 AP G3 5V 0R 0R TX_A RX_B GND Pin 7 Pin 6 100 150 Ohm 0 25W 2 RS485 EIA485 A B C D...
Страница 88: ...86 SOLIVIA 5 0 AP G3 6 9 1 2 3 Wieland 4 5 6 7 UPV 150V 8 S Setup 7 3 7 6 9...
Страница 103: ...101 SOLIVIA 5 0 AP G3 10 10 1 400 220 400 230 VNB Z 1 Z 2 1 2 400 220 400 230 4 6...
Страница 104: ...102 SOLIVIA 5 0 AP G3 VNB Z 1 Z 2 Z 3 400 220 400 230 400 220 400 230 4 6 1 2 3...
Страница 105: ...103 SOLIVIA 5 0 AP G3 10 2 3 3 Z 3 Z 3 3 3 B 32 A Solivia 5 0 B 32 A B 32 A kWh kWh Solivia 5 0 Solivia 5 0...
Страница 106: ...104 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3 Solivia 5 0...
Страница 109: ...107 SOLIVIA 5 0 AP G3...
Страница 110: ...108 SOLIVIA 5 0 AP G3...
Страница 111: ...109 SOLIVIA 5 0 AP G3 www solar inverter com Delta Energy Systems Germany GmbH Delta Energy Systems...
Страница 112: ...110 SOLIVIA 5 0 AP G3...
Страница 115: ...113 SOLIVIA 5 0 AP G3 3 12 IP65 4 4 1 4 2 150V 450V 540V IP65 25 C 60 C...
Страница 116: ...114 SOLIVIA 5 0 AP G3 4 3 1 4 5 2 3 RS485 EMC 4 6 kVA 1 2 3 RS485 EIA485 4 5 LED...
Страница 117: ...115 SOLIVIA 5 0 AP G3 5 TAB 2000 9 6 6 1 LED IP65 6 2 10cm 50cm Tyco IP65 50 cm 10 cm 50 cm 10 cm Wall Wall...
Страница 118: ...116 SOLIVIA 5 0 AP G3 319 5 150 320 200 6 5 12 12 5 90 38 12 410 0 5 6 3 6 4 1 6 4 8 2 32 0 3 4 5...
Страница 123: ...121 SOLIVIA 5 0 AP G3 6 9 121 SOLIVIA 5 0 AP G3...
Страница 138: ...136 SOLIVIA 5 0 AP G3 10 10 1 Z 1 Z 2...
Страница 139: ...137 SOLIVIA 5 0 AP G3 Z 1 Z 2 Z 3...
Страница 140: ...138 SOLIVIA 5 0 AP G3 10 2 3 3 Z 3 Z 3 3 3 kWh kWh...
Страница 141: ...139 SOLIVIA 5 0 AP G3 1 2 3 L1 N PE L2 N PE L3 N PE L1 N n PE L2 L3...
Страница 143: ...141 SOLIVIA 5 0 AP G3 RJ45 RJ RS485 ELA485 TAB 2000 TAB 2000 TAB 2000 DSO...
Страница 145: ...143...
Страница 146: ...144...