EN
37
Operation and installation manual SOLIVIA 2.5 AP G3 TR
House connection box
House connection line
VNB
Customer
Owner boundary
Z
(1)
Z
(2)
Measurement unit
(1) Meter for power consumption
(2) Meter for power feed-in
with back stop in each case
Remark: A meter can also be
employed which registers both energy
directions separately.
(3) Meter for power take-off of the
customer system
=
~
Consumer equipment
of the customer
Photovoltaic
generator with
power inverter
max. 4.6 kVA
Switching equipment
Electric circuit distributor
Anti-islanding protection with voltage and
frequency monitoring, as well as network
impedance measurement
Short-circuit protection
Overload protection
Individual in-plant generation system in parallel operation without isolated
operation possibility, single-phase feed with anti-islanding protection, separate feed.
Z
(3)
Low-voltage network ~ 400 / 220 V
Low-voltage network ~ 400 / 230 V
~ 400 / 220 V
~ 400 / 230 V
Содержание SOLIVIA 2.5 AP G3 TR
Страница 1: ...SOLIVIA 2 5 AP G3 TR Operation and installation manual ...
Страница 2: ......
Страница 4: ...2 Operation and installation manual SOLIVIA 2 5 AP G3 TR ...
Страница 46: ...44 ...
Страница 47: ......