background image

TECHNICAL DATASHEET

 

PJB Open Frame Power Supply 

24V 100W 1 Phase / PJB-24V100W

□□

A

 

 

 

  

All parameters are specified at 25°C ambient and AC input unless otherwise indicated.

 

  www.DeltaPSU.com (October 2020, Rev. 03)  

 

12

 

Power Boost 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷

 

𝑉𝑉𝐷𝐷𝑉𝑉𝑐𝑐𝑐𝑐

 (%) =  

𝑇𝑇

𝑃𝑃

𝑇𝑇𝑇𝑇𝐷𝐷𝑇𝑇𝑐𝑐

 

𝑇𝑇𝑇𝑇𝑇𝑇𝑐𝑐

   ; 

(

𝑇𝑇

𝑃𝑃

10 sec)

 

 

 

 

𝐴𝐴𝐴𝐴𝑐𝑐𝐴𝐴𝑇𝑇𝐴𝐴𝑐𝑐

 

𝑂𝑂𝐷𝐷𝐷𝐷𝑂𝑂𝐷𝐷𝐷𝐷

 

𝑃𝑃𝑇𝑇𝑃𝑃𝑐𝑐𝐴𝐴

 (

𝑃𝑃

𝐴𝐴𝐴𝐴𝐴𝐴

) =

(

𝑃𝑃𝑇𝑇𝑃𝑃𝑐𝑐𝐴𝐴

 

𝐵𝐵𝑇𝑇𝑇𝑇𝐵𝐵𝐷𝐷

  ×

𝑇𝑇

𝑃𝑃

) + (

𝑁𝑁𝑇𝑇𝑁𝑁

-

𝑃𝑃𝑐𝑐𝑇𝑇𝑃𝑃

 

𝑃𝑃𝑇𝑇𝑃𝑃𝑐𝑐𝐴𝐴

×

𝑇𝑇

𝑁𝑁

)

𝑇𝑇𝑇𝑇𝐷𝐷𝑇𝑇𝑐𝑐

 

𝑇𝑇𝑇𝑇𝑇𝑇𝑐𝑐

 

 

 

OR 

 

𝑁𝑁𝑇𝑇𝑁𝑁

-

𝑃𝑃𝑐𝑐𝑇𝑇𝑃𝑃

 

𝑃𝑃𝑇𝑇𝑃𝑃𝑐𝑐𝐴𝐴

=

�𝑃𝑃

𝐴𝐴𝐴𝐴𝐴𝐴

×

𝑇𝑇𝑇𝑇𝐷𝐷𝑇𝑇𝑐𝑐

 

𝑇𝑇𝑇𝑇𝑇𝑇𝑐𝑐� −

(

𝑃𝑃𝑇𝑇𝑃𝑃𝑐𝑐𝐴𝐴

 

𝐵𝐵𝑇𝑇𝑇𝑇𝐵𝐵𝐷𝐷

  ×

𝑇𝑇

𝑃𝑃

)

𝑇𝑇

𝑁𝑁

 

 

 

  An example of Power Boost and Average Output Power 

 

Power Boost 

Peak Power 

(W

P

Power Boost 

Duration (T

P

Duty Cycle 

Non-Peak 

Power (W

N

Non-Peak Power 

Duration (T

N

Total Time  

(T) 

200% 

206W 

10 sec 

15% 

85W 

57 sec 

67 sec 

200% 

206W 

5 sec 

15% 

85W 

28 sec 

33 sec 

160% 

165W 

10 sec 

40% 

62W 

15 sec 

25 sec 

160% 

165W 

5 sec 

40% 

62W 

7.5 sec 

12.5 sec 

 

 

It is not recommended to prolong the duration of Power Boost to be longer than the specified duty cycle calculation, this may cause 

damage to the PSU. 

 

 

Power Boost is the reserve power available 

constantly that allows reliable startup to 

support sudden and short spike of loads with 

high inrush current typically during turn on to 

remove the need of more expensive higher 

rated power supply unit. After the output has 

reached its steady state set value, the power 

supply can support surge loads with a higher 

short-term power demand up to 200% of 

maximum rated load (I

O

  Max), for a 

maximum duration of 10  seconds. The 

Power Boost is also available to repeatedly 

basis with according to the condition of an 

average (R.M.S) output power shall not 

exceed continuous operating condition or 

refer to duty cycle calculation below. 

 

Fig. 2  Duty Cycle Calculation

 

Содержание PJB-24V100WA

Страница 1: ...rush current and conformal coating on the PCBAs to provide protection against dust and chemical pollutants The built in active PFC provides PF 0 97 and fulfills Harmonic Current Emission according to...

Страница 2: ...g at 24V 8 60A Power Boost for 10 seconds at 24V refer to the details in the Functions section Output Power 103 2W continuously operating at 24V 206 4W Power Boost for 10 seconds at 24V refer to the d...

Страница 3: ...Degree 2 Protections Overvoltage 27 6 33 6V Latch Mode Overload Overcurrent 220 of rated load current Hiccup Mode Non Latching Auto Recovery Over Temperature Latch Mode Short Circuit Hiccup Mode Non...

Страница 4: ...4 Level 3 Criteria A1 2kV Surge IEC 61000 4 5 Level 3 Criteria A1 Common Mode2 2kV Differential Mode3 1kV Conducted IEC 61000 4 6 Level 3 Criteria A1 150kHz 80MHz 10Vrms Power Frequency Magnetic Fiel...

Страница 5: ...Connector 3 VR 4 Remote ON OFF JST B2B XH A 5 Chassis Dimensions Open Frame L x W x D 155 x 62 x 33 5 mm 6 10 x 2 44 x 1 32 inch L Frame L x W x D 185 x 72 x 45 mm 7 28 x 2 83 x 1 77 inch Notes Dimens...

Страница 6: ...Rev 03 6 Item Device Description 1 Input Connector 2 Output Connector 3 VR 4 Remote ON OFF JST B2B XH A 5 Cover 6 Chassis Enclosed L x W x D 185 x 72 x 45 mm 7 28 x 2 83 x 1 77 inch Notes Dimensions a...

Страница 7: ...nce at all sides from other components and equipments Please insert an insulation sheet between the system and product if the safety distance is less than 4mm 0 16 inch Use flexible cable stranded or...

Страница 8: ...ting for Mounting Orientation A B 40 C de rate power by 2 5 C De rating for Mounting Orientation C 35 C de rate power by 2 C De rating for Mounting Orientation D E 30 C de rate power by 2 C De rating...

Страница 9: ...or be damaged when the power supply is continuously used outside the shaded region refer to the graphs shown above 2 If the output capacity is not reduced when the surrounding air temperature is more...

Страница 10: ...t Current mA Output ON Output OFF 1k 5 12 5 0 0 5 20 Max Notes 1 Remote ON OFF circuits are isolated from input output and PE 2 Please check if the polarity of the wire connector is the same as the ex...

Страница 11: ...te set value after the input voltage is applied Rise Time The time required for the output voltage to change from 10 to 90 of its final steady state set value Hold up Time Time between the collapse of...

Страница 12: ...Power Boost to be longer than the specified duty cycle calculation this may cause damage to the PSU Power Boost is the reserve power available constantly that allows reliable startup to support sudde...

Страница 13: ...ustration in the OLP OCP section on this page The power supply will return to normal operation after the short circuit is removed Overload Overcurrent Protections Auto Recovery The power supply s Over...

Страница 14: ...nvironment complying with EN 61000 3 2 is only necessary under special conditions Complying to this standard can have some technical drawbacks such as lower efficiency as well as some commercial aspec...

Отзывы: