TECHNICAL DATASHEET
CliQ II DIN Rail Power Supply
48 V 60 W 1 Phase / DRP048V060W1B
All parameters are specified at 25°C ambient and AC input unless otherwise indicated.
www.DeltaPSU.com (September 2021, Rev. 06)
9
Assembly & Installation
The power supply unit (PSU) can be mounted on 35
mm DIN rails in accordance with EN 60715. The device should be installed with
input terminal block at the bottom.
Each device is delivered ready to install.
Mounting
Dismounting
Fig. 2.1 Mounting
Snap on the DIN rail as shown in Fig. 2.1:
1. Tilt the unit upwards and insert it onto the DIN rail.
2. Push downwards until stopped.
3. Press against the bottom front side for locking.
4. Shake the unit slightly to ensure that it is secured.
Fig. 2.2 Dismounting
To uninstall, pull or slide down the latch with screw driver as
shown in Fig. 2.2. Then slide the power supply unit (PSU) in the
opposite direction, release the latch and pull out the power
supply unit (PSU) from the rail.
CAUTION:
Must tighten wire to housing (Fig. 3.1) before
plugging into the terminal block connection (Fig. 3.2).
In accordance to EN 60950 / UL 60950 and EN 62368 / UL
62368, flexible cables require ferrules. Use appropriate copper
cables designed to sustain operating temperature of 60°C / 75°C
or more to fulfill UL requirements.
Connection
Fig. 3.1
Fig. 3.2