- -
24
The wires coming from the
conductivity/Pt100 temperature combined probe
can be welded di-
rectly on the connector as reported in the following table.
Sensor
Direct connection to the connector DIN45326
Jumper
2-ring
conductivity
probe
Pt100
temperature
sensor
Pt100
Internal view of the connector
Jumper between
pins 1 and 4
Jumper between
pins 2 and 5
4-ring
conductivity
probe
Pt100
temperature
sensor
Pt100
Internal view of the connector
None
Ensure the welds are clean and perfect. Once the welding operation is complete, close the two
shells, insert the gasket in the module
,
screw the fairlead. At the other end of the module, enter the
ring with the O-Ring as indicated in the picture.
Make sure the cable is not twisted while you are screwing the fairlead. Now the probe is ready.
Содержание HD2106.1
Страница 4: ...4 Conductivity meter Thermometer HD2106 1...
Страница 6: ...6 Conductivity meter Thermometer HD2106 2...