Assembly Manual
1.5 OCS Sealed Connection System
F
emale/Male 1.5 Terminal System
Contact at STC Saltillo: David 52 844 438 9060
Assembly Manual - 13987928
58
MALE TERMINAL OCS 1.5/CAVITY PLUG REPLACEMENT (Move PLR to Pre-Stage)
– STEP 1a
MALE TERMINAL OCS 1.5/CAVITY PLUG REPLACEMENT (Move PLR to Pre-Stage)
– STEP 1b
REPAIR / REPLACEMENT
LOCATE THE AREAS TO INSERT TOOL 15313892
INSERT TOOL INTO THE SHROUD, WITH THE
HOOK FACING TOWARD THE CENTER OF
CONNECTOR AND PLACE IT BEHIND THE PLR
ONCE THE TOOL IS IN PLACE,
ROTATE IT TO GRASP THE PLR ARM
TWIST THE TOOL TO DEFLECT THE PLR ARM
AND CAREFULLY PULL THE TOOL
BACKWARDS TO MOVE THE PLR
DETAIL