www.dellonda.co.uk
6
• Step 2 - Top rail assembly
• Begin socketing the curved rail sections (3) into the T Connectors (10) ensure that the T
connectors are assembled the same way round with the leg socket pointing down (opposite
side to the spring holes).
• 2 people will be required to assemble the frame.
10
3
3
10
• Depending on the size of your trampoline your frame will either have six top rail sections (3)
and T Connectors (10) or eight.
• The assembly process is the same for both.
Spring holes
Leg socket
position
4
5
• Socket the vertical leg extenders (4) onto the base leg (5) as shown in the illustration, secure
in place the screws provided.
• Step 3 - Leg assembly
• Lift the frame and insert to assembled legs into the T sockets from the underside of the ring
frame. (The legs will be bolted on when the safety net legs are added).