background image

www.dellonda.co.uk

6

•  Step 2 - Top rail assembly

•  Begin socketing the curved rail sections (3) into the T Connectors (10) ensure that the T 

connectors are assembled the same way round with the leg socket pointing down (opposite 

side to the spring holes).

•  2 people will be required to assemble the frame.

10

3

3

10

•  Depending on the size of your trampoline your frame will either have six top rail sections (3) 

and T Connectors (10) or eight.

•  The assembly process is the same for both.

Spring holes

Leg socket 

position

4

5

•  Socket the vertical leg extenders (4) onto the base leg (5) as shown in the illustration, secure 

in place the screws provided.

•  Step 3 - Leg assembly

•  Lift the frame and insert to assembled legs into the T sockets from the underside of the ring 

frame. (The legs will be bolted on when the safety net legs are added).

Содержание DL67

Страница 1: ...red to a high standard this product will if used according to these instructions and properly maintained give you years of trouble free performance DL67 Issue 1 19 07 21 www dellonda co uk Dellonda 8f...

Страница 2: ...ously use the trampoline for make regular stops Do not use this trampoline whilst under the influence of alcohol or drugs or under any instruction from a Doctor Stop exercising immediately should you...

Страница 3: ...objects underneath the trampoline This will increase the chances of an injury occurring DO NOT hold any foreign objects in your hand and DO NOT place any objects on the trampoline while in use DO NOT...

Страница 4: ...ong to ensure the safety of trampoline user Be aware and advise the trampoline user of all the safety warnings IMPORTANT If the trampoline can not be supervised there should be a method for securing i...

Страница 5: ...is our special spring loading tool provided with this product During periods of non use This trampoline can be easily disassembled and stored Please read the assembly instructions before beginning to...

Страница 6: ...ure you have plenty of space to begin assembly layout the frame components as shown prior to starting assembly DL67 8ft and DL68 10ft Trampolines with 3 legs Ensure you have plenty of space to begin a...

Страница 7: ...epending on the size of your trampoline your frame will either have six top rail sections 3 and T Connectors 10 or eight The assembly process is the same for both Spring holes Leg socket position 4 5...

Страница 8: ...and start adding the springs beginning with 4 evenly spread as shown in the illustration this will keep your mat taught and will make it easier to attach the rest Description Unit 6 8 10 12 Springs Pc...

Страница 9: ...ding so the tie straps line up with the leg positions Tie the padding around the frame and leg this will help to stop the padding from moving Safety net Safety net assembly Parts list Ref Number Descr...

Страница 10: ...e top cap on each pole using the self tapping screws Step3 Over the assembled pole slide the waterproof cover sleeve ensuring it slides over the top of the cap but not over the shoulder and down the p...

Страница 11: ...to sag or loosen it WILL compromise the safety of your trampoline and it s users This should complete the assembly of your trampoline please ensure you have read and understood all of the safety info...

Страница 12: ...lter data specifications and component parts without prior notice Important No Liability is accepted for incorrect use of this product Warranty Guarantee is 12 months from purchase date proof of which...

Отзывы: