-
12
-
4.2 Assembly SOP
Preparation before assembly
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, materials as bellow
:
1) Working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Gloves
5) Cleaning cloth
6) ESD protection
Item
Picture
Operation
Tools
Notes
1
1. Assemble SPS BD into
Main SHD
2. Insert LVDS cable into
I/F BD
3. Insert SPS BD wire into
I/F BD and assemble I/F
BD into Main SHD.
4. Lock 5 PCB screws
5. Lock 2 hex screws
1. Philips-head
screwdriver
Torsion of
PCB screw:
8.5±1.0Kg
2. Hex-head
screwdriver
Torsion of hex
screw:
5.0±0.6Kg
Содержание SE2422HXB
Страница 1: ... 1 Simplified Service Manual SE2422HXB Version 01 Date 2021 02 25 ...
Страница 7: ... 7 3 Wiring connectivity diagram Wire1 FFC 1 ...
Страница 15: ... 15 5 Trouble shooting instructions ...
Страница 16: ... 16 ...
Страница 17: ... 17 ...
Страница 18: ... 18 ...
Страница 19: ... 19 ...
Страница 20: ... 20 ...