12
Rack Installation Guide
Figure 1-3.
One Rack Unit
2
Mark the rack’s front vertical rails with a felt-tipped pen or masking tape
approximately 44.45 cm (17.5 inches) above the original mark you made
(or count up 30 holes in a rack that meets CEA-310-E standards).
(If you counted holes, place a mark just above the top hole.) This mark
or piece of tape indicates where the system’s upper edge will be located
on the vertical rails (see Figure 1-4).
1 U (44 mm or 1.75 inches)
12.7 mm (0.5 inch)
15.9 mm (0.625 inch)
15.9 mm (0.625 inch)
12.7 mm (0.5 inch)
Содержание PowerEdge M1000e
Страница 2: ......
Страница 3: ...Rack Installation Guide ...
Страница 6: ...4 Contents ...
Страница 15: ...Rack Installation Guide 13 Figure 1 4 Marking the Vertical Rails 1 tape on vertical rails 1 ...
Страница 29: ...Guide d installation du rack ...
Страница 32: ...30 Sommaire ...
Страница 54: ...52 Guide d installation du rack ...
Страница 57: ...Rack Installations anleitung ...
Страница 60: ...58 Inhalt ...
Страница 84: ...82 Rack Installationsanleitung ...
Страница 87: ...ラック取り付けガイド ...
Страница 90: ...88 目次 ...
Страница 105: ...ラック取り付けガイド 103 図 1 7 ラックへのシステムの取り付け 1 蝶ネジ 4 2 LCD モジュール 3 レールアセンブリ 2 3 2 1 ...
Страница 111: ...ラック取り付けガイド 109 ラック扉の取り付け ラックキャビネットに付属のマニュアルに記載されている扉の取り付け手 順を参照してください これでラックへのシステムの取り付けは完了です ...
Страница 112: ...110 ラック取り付けガイド ...
Страница 115: ...Guía de instalación del rack ...
Страница 118: ...116 Contenido ...
Страница 127: ...Guía de instalación del rack 125 Figura 1 4 Marcado de los rieles verticales 1 Cinta en los rieles verticales 1 ...
Страница 142: ...140 Guía de instalación del rack ...