Rack Installation Guide
9
Figure 1-2.
VersaRails Rack Kit Contents
Installation Tasks
Installing a rack kit involves performing the following tasks (described in detail in subsequent
sections) in their numbered order:
1
Removing the rack doors
2
Marking the rack
3
Installing the mounting rails in the rack
•
RapidRails installation
•
VersaRails installation
•
Static Rails Installation
4
Installing the system in the rack
5
Routing cables and securing with releasable tie wraps
6
Replacing the rack doors
NOTE:
Three procedures are provided for task 3. These procedures are for the RapidRails kit,
the VersaRails kit, and the Static Rail kit.
10-32 x 0.5-inch flange-
head Phillips screws (8)
mounting rails (2)
releasable tie wrap
attachment points (2)
Содержание PowerEdge 860
Страница 2: ......
Страница 3: ...Rack Installation Guide ...
Страница 30: ...28 Index 28 Index ...
Страница 31: ...Guide d installation du rack ...
Страница 56: ...54 Guide d installation du rack ...
Страница 59: ...Rack Installationsanleitung ...
Страница 84: ...82 Rack Installationsanleitung ...
Страница 87: ...ラック取り付けガイド ...
Страница 112: ...110 ラック取り付けガイド ...
Страница 115: ...Guía de instalación del rack ...
Страница 140: ...138 Guía de instalación del rack ...