Rack Installation Guide
23
Figure 1-13.
Installing the Mounting Rails for Center-Mount Configuration
Flush-Mount Installation
The two-post rack kit is shipped with the brackets configured for a 7.62-cm (3-inch) wide center-
mount installation. See Figure 1-10 for mounting rail components. To prepare the mounting rails
for flush-mount installation in the two-post rack, perform the following steps:
1
Locate the two mounting rails and place them side by side on a smooth work surface,
with the front ends of the mounting rails toward you (see Figure 1-14).
2
Using a 3/8-inch wrench or nut driver, remove two nuts from the adjustable mounting bracket
(see Figure 1-14).
3
Remove the bracket and then place the bracket on either the 7.62-cm or 15.24-cm
(3-inch or 6-inch) wide flush-mount threaded studs (see Figure 1-14).
12-24 x 0.5-inch pan-head
Phillips screws (4 per rail)
two-post open-frame rack
mounting
rails (2)
release latch
center-mount mounting flange
system rails (2)
Содержание PowerEdge 860
Страница 2: ......
Страница 3: ...Rack Installation Guide ...
Страница 30: ...28 Index 28 Index ...
Страница 31: ...Guide d installation du rack ...
Страница 56: ...54 Guide d installation du rack ...
Страница 59: ...Rack Installationsanleitung ...
Страница 84: ...82 Rack Installationsanleitung ...
Страница 87: ...ラック取り付けガイド ...
Страница 112: ...110 ラック取り付けガイド ...
Страница 115: ...Guía de instalación del rack ...
Страница 140: ...138 Guía de instalación del rack ...