Securing the Chassis Ground
After you mount the chassis, secure the chassis ground as follows:
1.
Locate the chassis ground connector nuts on the chassis rear.
2.
Install the grounding cables to the ground nuts. The grounding cable must comply with your local
electrical codes in size and color (typically the color is green or green with yellow stripe).
NOTE: For proper ventilation, position the chassis in an equipment rack (or cabinet) with a
minimum of 5 inches (12.7 cm) of clearance around exhaust vents. The acceptable ambient
temperature ranges are listed in the
Environmental Parameters
section.
Use M5 screws.
3.
Tighten the screws (torque should be between 18 and 24 inch/lbs).
4.
Connect the opposite end of the grounding cable to the nearest appropriate facility grounding post.
Figure 6. Cable Connector
Z9500 Installation
27
Содержание Networking Z9500
Страница 1: ...Dell Networking Installation Guide for the Z9500 Switch ...
Страница 6: ...6 ...
Страница 8: ...8 ...
Страница 16: ...16 ...
Страница 26: ...1 Additional screw to restrict front back movement of the switch 2 Main screw 26 Z9500 Installation ...
Страница 38: ...38 ...
Страница 40: ...40 ...