Installation and Setup
Installing a PS6000 Array
2–8
2. Connect the array to the network. See
Step 2: Connect the Array to the
3. Turn on power to the array. See
Step 3: Turn on Power to the Array
4. If you plan to use the
setup
utility to configure the software, see
Up a Serial Connection to the Array
If you plan to use the Remote Setup Wizard to configure the software, skip
this step.
The following sections describe the installation steps in detail. After completing
the hardware installation, see Chapter 3,
Step 1: Connect the Array to Power
A PS6000 array includes two modules that supply both power and cooling. One
functioning power supply and cooling module connected to a source of power is
required for array operation.
Obtain the power cables that were shipped with the array. If the array was not
shipped with power cables, see your PS Series support provider or reseller for
power cable information.
Connect both power supply and cooling modules to a source of power. Use the
cable strain relief to secure each power cable to the array.
For increased availability, follow these power recommendations:
•
Connect the power supply and cooling modules to different sources of power
on separate circuits. See Figure 2-4.
•
Connect one power supply and cooling module to a UPS system and connect
the other module to a different source of power.
Notes:
Do not
turn on power to the array. At this time, the power cables are only
for grounding purposes.
See
on page 2-5 for information about
voltage requirements.