a. Attach a Fibre Channel fiber optical cable (LC connector) to an I/O module
port on the controller, and attach the other end (LC connector) to an FC
switch or to an FC port on your server.
Power on all systems
Note
Power on all expansion shelves first before powering on the controller.
1. Connect power cables to each expansion shelf receptacle and attach the retention
clips.
2. Provide power to power on each expansion shelf. The shelves power on when
plugged in. Ensure that each shelf power cable is connected to a different power
source.
Note
Wait approximately 3 minutes after all expansion shelves are powered on before
powering on the controller.
3. Provide power to power on the controller. The system powers on when plugged in.
The first boot may take several minutes to complete.
Note
DD6300, DD6800, and DD9300 systems should be powered from redundant AC
sources. Redundant power sources allow one AC source to fail or be serviced
without impacting system operation. PSU0 should be attached to one AC source.
PSU1 should be attached to the other AC source.
a. Connect power cables to each receptacle and attach the retention clips.
b. Ensure that each power supply is connected to a different power source.
Connect Cables and Power on
Power on all systems
71
Содержание DD6300
Страница 6: ...FIGURES 6 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...
Страница 8: ...TABLES 8 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...
Страница 10: ...Revision history 10 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...