Field-installed systems
This installation guide is primarily intended for systems shipped as components to be
installed in an existing rack on site. Follow all the instructions in this document to rack,
cable, and configure the system.
Factory-racked systems
Factory-racked systems are pre-installed in the rack, with the cables already
connected. Follow the instructions in the chapter
Configure System For Use
to
configure the factory-racked system.
The following documents, available from the Online Support website at
, provide additional information about the factory rack:
l
Dell EMC 40U-P Cabinet Site Preparation Guide
l
Dell EMC 40U-P Cabinet Unpacking and Setup Guide
l
Data Domain Rack Service Guide
Planning and Site Preparation
14
Data Domain DD6300, DD6800, and DD9300 Systems
6.1
Hardware Overview and Installation Guide
Содержание DD6300
Страница 6: ...FIGURES 6 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...
Страница 8: ...TABLES 8 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...
Страница 10: ...Revision history 10 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...