Figure 8. Two-post flush-mount configuration
2
Attach one rail to the front post flange with two user-supplied screws. See item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws. See item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws. See item 1.
S5048F-ON switch installation
21
Содержание S5048F-ON
Страница 1: ...S5048F ON Installation Guide October 2017...