background image

18

x*

x

x x

x

x

x

x

x

x

x

x

x

Installation

The position of the fastener kits on 
the cover is indicated on the drawings 
shipped with the slats.

 

LOCKING KITS

Without steps

With Roman 

steps

kit at the end 

of the steps

Roman

2 kits at max. 

50 cm from the 

edge 

kit at max. 

50 cm from 

the edge

1 kit centred if < 1 m
1 kit at 50 cm from the edge if < 2 m
2 kits if > 2 m

* X must never exceed 2 m

With side

steps

With

straight 

or trapezoidal 

steps

Positioning rules

All changes to the positioning of the kits must comply with the rules given below.
For other cases please contact us.

Содержание CONTURA-L

Страница 1: ...CONTURA L AUTOMATIC ABOVE GROUND COVER TECHNICAL INSTRUCTIONS Installation Use Cleaning Maintenance Safety advice ...

Страница 2: ... USER AFTER INSTALLATION IS COMPLETE PLEASE READ CAREFULLY AND KEEP IN A SAFE PLACE Automatic motorised above ground safety cover using either mains electricity power The opening or closure operation requires about 2 minutes for one person and about 3 minutes to lock or unlock the attachment kits ...

Страница 3: ...de and the cover must be 70 mm The cover is connected to the tube using white straps that are attached to the first slat of the cover There are fixture straps at the start and end of the cover used to fix the cover to the fastening kit fixed to the side of the pool Fastening kits Push lock 3 fixture modes surface mount insert mount hanging mount The fastening kits are positioned on each width of t...

Страница 4: ...4 x1 x1 x2 x1 x6 x2 x8 x4 x6 x6 x1 x1 x1 x1 M8 12x60 M8x80 M8 M6 M6x16 n 4 3x16 x4 M6 x6 M8x50 DELIVERED PARTS OPTION CHLORINE INHIBITOR or D e s c r i p t i o n Option Wi Key ...

Страница 5: ...3 n 17 T22 PACKING LIST e g for a 4 x 8 m pool 1 0 80 x 0 60 x 0 55 pallet 40kg 1 4 30 x 0 20 m pack 25 kg 4 5 x 0 25 x 0 20 m packs 150 kg Total weight 205 Kg TOOLS ASSEMBLY INSTRUCTIONS 3 hours D e s c r i p t i o n ...

Страница 6: ... n s t a l l a t i o n Remember to have a sheath fitted to connect the electric control box and the motor terminal see positioning rules 1 page 7 D measurement between the terminal pool width 2 Instructions before installation Install the adjustment screw ...

Страница 7: ...7 x1 x1 x1 I n s t a l l a t i o n Assembly Position 1 Depending on the pool corners and the fastener kits on the roller side motor side Sharp corner Rounded corners or cut off corners Max 60 cm or ...

Страница 8: ...8 5 mm 5 mm I n s t a l l a t i o n Position 2 centre of the width motor side ...

Страница 9: ... x2 3x16 x6 x6 x6 M8 M8 12x60 M8x80 I n s t a l l a t i o n Fix 5 mm Fix the adjustment bar Before fixing check that there is an operating gap of 5 mm on each side see positioning 2 previous page Levelling ground ...

Страница 10: ...10 n 10 M6 M6 x4 x4 x8 I n s t a l l a t i o n ASSEMBLING THE MOTOR Make small rotating movements with the motor to ease its fitting ...

Страница 11: ...11 I n s t a l l a t i o n ...

Страница 12: ...The installation must comply with the NF C15 100 standard and et CEI 60364 Last applicable version ask your electrician for advice or contact your electricity provider All our control boxes use a 230 Volt single phase 50Hz power supply The required power at the input terminals is 0 15 Kw Upstream from the control box a suitably sized circuit breaker with a 30 mA ground fault device must be provide...

Страница 13: ...tandard and et CEI 60364 Last applicable version ask your electrician for advice or contact your electricity provider All our control boxes use a 230 Volt single phase 50Hz power supply The required power at the input terminals is 0 15 Kw Upstream from the control box a suitably sized circuit breaker with a 30 mA ground fault device must be provided 2 x 1 mm STOP SEL OPTION Wiring refer to the man...

Страница 14: ... does not run check the power supply polarity The support must be attached to a fixed support Closing Opening Stops the current action Keyboard lock red green flashing emitter locked Emitter unlocking procedure see page 23 The emitter must be located outside volume 0 The distance between the emitter and the receiver must not exceed 50 m in an obstacle free zone 25 m behind a basic wall 15 m behind...

Страница 15: ...ack CLICK along the whole length of the slat Repeat the movement until all the slats are completely clipped together Make sure the slats are in the right direction Roller water I n s t a l l a t i o n By clipping By sliding remove the cap 35 cm If necessary cut the sides to ease the passage of the cover and avoid rubbing strap ...

Страница 16: ... X 16 notch skid assembly The skids are used to orient the cover at the start of closure The holes are drilled at the factory I n s t a l l a t i o n Assembly of the strap between the cover and the tube ...

Страница 17: ...cover s direction of movement Turning in the direction will increase the extension of the cover Turning in the direction will reduce the extension of the cover Checking the order logic If the command logic is not correct reverse wires 1 and 2 on the motor output see wiring diagram Pool opening Pool closure ...

Страница 18: ...man steps kit at the end of the steps Roman 2 kits at max 50 cm from the edge kit at max 50 cm from the edge 1 kit centred if 1 m 1 kit at 50 cm from the edge if 2 m 2 kits if 2 m X must never exceed 2 m With side steps With straight or trapezoidal steps Positioning rules All changes to the positioning of the kits must comply with the rules given below For other cases please contact us ...

Страница 19: ...crewing this would deteriorate the fixture quality Concrete After reaching the resistance point make 3 more turns of the screwdriver to finish tightening Concrete block Plug Washer Washer 5 cm Ø8 VBA TF Z pozi stainless steel A4 Ø6 x 60 wood screw Screw cap Hollow white Ø16 washer Inserted part Screw cap Hang mount support Ø12 Nylon plug Stainless steel nut A4 M10 Cale 13 mm VBA TF Z pozi stainles...

Страница 20: ... requires about 2 minutes for one person and about 3 minutes to lock or unlock the attachment kits Opening Always release the cover before starting the motor Unlock all the fastening systems Operate the open control Lock the WI Key command and put away the key Closure Operate the close control Lock all the fastener systems Lock the WI Key command and put away the key LOCKING AND RELEASING PUSH LOC...

Страница 21: ...e successively press the following 3 keys The pilot remains on emitter unlocked LIGHT INDICATORS Wi key unlocked Wi key locked Battery level low Change the batteries 2 x LR03 Green LED Red green flashing LED Orange LED Red LED When you press a key the light indicators below provide information on the Wi key status locked unlocked as well as the battery charge level f a same tim s ked m loc WIKEY ...

Страница 22: ...y as soon at the water reaches 25 C Winter the pool depending on its geographic location Close the cover in the safety position Leave the batteries connected inside the roller and do not cover the solar panel We recommend you install the IVERNEA winter shield to protect the cover from UVs and dirt U s e All work must be carried out by a professional who will contact the manufacturer if necessary A...

Страница 23: ...y Protection index Pairing delivered pre paired Pilot Pilot O O F F STOP STOP Press STOP and without releasing it press O for more than 3 seconds OK when the pilot flashes green an emitter must be paired within the next 30 seconds Press STOP and without releasing it press O for more than 3 seconds OK when the pilot flashes red green another emitter must be paired within the next 30 seconds receive...

Страница 24: ...TIAL FACTORS FOR THE SAFETY OF YOUNG CHILDREN BE AWARE THAT SAFETY IS ONLY ACHIEVED BY A CLOSED COVER THAT IS LOCKED AND CORRECTLY INSTALLED IN COMPLIANCE WITH THE MANUFACTURER S INSTRUCTIONS COMPLY WITH THE WATER HEIGHTS DEFINED BY THE MANUFACTURER THE COVER MUST SYSTEMATICALLY BE CLOSED DURING ALL ABSENCES FROM HOME HOWEVER SHORT MAKE SURE THERE ARE NO BATHERS OR FOREIGN BODIES IN THE POOL BEFOR...

Отзывы: