c.  Remove the screw from the bottom mounting tab.
d. Back the upper mounting tab screw out about two turns and lift 

the MCD up and off of the spa.

  2.  Remove the MCD Cover

a. Remove the cover screw on the back side of the base of the 

MCD.

b. Using a flathead screwdriver or fingers, pry the two cover tabs 

outward to release the cover from the base.

c.  Lift the cover up.
d. Slide cover forward and off.

  3.  Remove the old ozone cell, power supply and hose    
    barb fitting 

a. Remove power supply mounting screws.
b. Disconnect power supply connector (red & black wires).
c.  Lift ozone cell up and out (grommet and hose barb fitting may 

remain attached to ozone cell).

d. Remove and discard ozone cell power supply and Hose Barb 

fitting along with tubing.

  4.  Install the new ozone cell, power supply, hose barb
    insert, and grommet

a. Place new grommet into enclosure wall.
b. Insert new hose barb insert making sure to align the hose barb 

correctly and insert it completely into its slotted hole. 

c.  Install power supply and mounting screws. Route power supply 

wires through pegs.

d. Connect ozone cell to power supply connector.
e. Slide cover into position while lifting the base of the cover up.
f.  Lower cover over ozone cell and snap cover tabs into place.
g. Replace cover screw.
h. Reinstall the MCD into the spa, reconnect ozone supply tubing to 

hose barb and reconnect the power cord.

Содержание MCD-250U

Страница 1: ...MCD U Spa Ozone Generator For Models MCD 50U MCD 250U Installation Operations Manual 4 2308 01 Rev A...

Страница 2: ...or under a cover sheltered from natural elements rain sun sprinklers Mount the MCD so that it is inaccessible to anyone in the spa Mount the MCD using the mounting tabs such that the MCD is vertical w...

Страница 3: ...Assembly 1 5 Mounting 1 6 Plumbing Vacuum System 1 7 Plumbing Ozone Generator 2 8 Electrical 2 9 Operation 3 10 Installation Complete 3 SECTION 2 Maintenance Instructions 3 1 Remove the MCD from your...

Страница 4: ...Installation Parts Common Installation Parts for MCD Spa Ozone Generators One 1 Installation Manual 4 2308 01 One 1 check valve 7 1140 01 Five 5 feet of tubing 7 0075 Four 4 hose clamps 2 0078 Two 2...

Страница 5: ...ource Secure tubing in this position c Cut the tubing near the vacuum source slide hose clamps on each end and install the check valve in the tubing Observe the flow arrow on the check valve and ensur...

Страница 6: ...does not push past the check valve during any spa cycle e Check for and correct any leaks 10 Installation Complete a Once properly installed the Ozone Generator requires no further user operation It...

Страница 7: ...ozone cell up and out grommet and hose barb fitting may remain attached to ozone cell d Remove and discard ozone cell power supply and Hose Barb fitting along with tubing 4 Install the new ozone cell...

Страница 8: ...5 MCD Installation Operations Manual Figure 2 MCD Component Locations OZONE POWER SUPPLY MOUNTING SCREWS OZONE CELLS HOUSE BARB FITTING SLIDE COVER OFF LIFT COVER UP...

Страница 9: ...6 MCD Installation Operations Manual DELQUIK BASIC WATER CHEMISTRY CHART...

Страница 10: ...and power supply replacement information For optimum performance we recommend the ozone cell and power supply be replaced every five years Fill out the following form each time you replace the ozone c...

Страница 11: ...ability or implied warranty of fitness for particular purpose and such warranties are hereby disclaimed f DEL Ozone shall not be liable under any circumstances for loss of use of such product loss of...

Страница 12: ...3580 Sueldo Street San Luis Obispo CA 93401 800 676 1335 o3info delozone com www delozone com EPA Estab No 071472 CA 001...

Отзывы: