Phantom Installation, Operation & Service Manual
3-4 Controls
3.3.2 Miscellaneous Controls
Figure 3-2 below shows the miscellaneous controls of the Phantom X-ray
system. The paragraphs that follow describe each control.
Figure 3-2. Miscellaneous Controls
1
Prep/ Exposure
- This two-position switch controls x-ray output. The
first position is for prep. This causes the READY light on the main
control panel to go out and then come on again to indicate the unit is
ready for exposure. The button is then pressed and held all the way
down to start an exposure as indicated by the X-RAY indicator on the
main control panel lighting up. If you press and release the button
before the READY light comes on, the process will be stopped and the
FAULT light will come on. The unit can be reset by pressing the
RESET button on the main control panel.
2
Control Handles -
These handles are used to maneuver the unit into
position over the patient.
3
Cassette Holder
- This compartment is used to hold film cassettes.
The compartment has a spring-loaded brace that holds the cassettes
firmly in place to keep them from rattling when the unit is moved.
4
Wheel Brakes
- These brakes lock the rear wheels in place after the
unit has been positioned over the patient.
1
3
4
6
7
8
9
X-Ray Head
2
5
Tube Arm
Locking Cylinder
Front Leg
Assembly
Содержание DynaRad Phantom-8000
Страница 6: ...Phantom Installation Operation and Service Manual 4...
Страница 24: ...Phantom Installation Operation Service Manual i 18 Applicable Standards...
Страница 26: ...Phantom Installation Operation Service Manual ii 2...
Страница 66: ...Phantom Installation Operation Service Manual 3 24 Folding Phantom...
Страница 74: ...Phantom Installation Operation Service Manual 4 8 Check tube head rotation friction lock...
Страница 84: ...Phantom Installation Operation Service Manual 5 10 Adjustments 5 3 Adjustments Not applicable for this product...
Страница 106: ...Phantom Installation Operation Service Manual 6 22 Release Cable Replacement...
Страница 116: ...Phantom Installation Operation Service Manual 8 2 Electrical Schematics...
Страница 117: ......
Страница 118: ......
Страница 119: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 126: ......
Страница 127: ......
Страница 147: ...Phantom Installation Operation Service Manual 9 20 Control Chassis Assembly 501203...
Страница 148: ...Phantom Installation Operation Service Manual n 1 Notes...
Страница 149: ...Phantom Installation Operation Service Manual n 2 Notes...
Страница 150: ...Phantom Installation Operation Service Manual n 3 Notes...
Страница 151: ...Phantom Installation Operation Service Manual n 4 Notes...