![dehn HVI long Conductor Скачать руководство пользователя страница 35](http://html.mh-extra.com/html/dehn/hvi-long-conductor/hvi-long-conductor_installation-instructions-manual_2465081035.webp)
15
1811_MO_1012_DE_GB_063061
α
α
≥
0.5 m
≤
2.5 m
α
α
1000 mm
2500 mm
1,45 ± 2 cm
Bereich
Endverschluss
7.
Installation considering the wind load zone
Figure 12
Supporting tube for a max. wind speed of 185 km/h (variant I)
for a max. wind speed of 145 km/h (variant II)
antenna
Supporting tubes fixed on site (variant I) can withstand wind speeds up to 185 km/h (wind load
zone IV). (1 x HVI
®
conductor integrated and 1 or 2 external
HVI
®
conductors
).
Supporting tubes installed in a tripod (variant II) (1 x integrated
HVI
®
conductor
or 1 or 2 exter-
nal
HVI
®
conductors
) are suitable for wind speeds up to 145 km/h (wind load zone II).
antenna mast
EB connection
supporting tube GRP/Al
Part No. 105 300
air-termination rod
StSt Ø 10 mm
L = 1000 mm
Part No.101 001
metal earthed
connection to the
equipotential bonding of
the building
EB connection element
variant I
variant II
air-termination rod
AI Ø 16/10 mm
L 2500 mm