I- INTRODUCTION
This manual explains how to install the LOLe operating light, to the ceiling using a ceiling adapter, to the wall with the
wall adapter plate or to the dental unit.
Please read those instructions carefully before installing the unit.
NOTE :
Information given in this manual should be taken as a general guide for proper installation of the LOLe
operating light. However, in case of contradiction to any local or national building regulations, the
building regulation must always override this manual. In this case, please contact previously to any
changes your local dealer.
NOTE :
The operating light must be serviced by qualified personnel only, trained by approved dealers. Repairs
and parts replaced by unqualified personnel carry no warranty.
ENVIRONMENTAL REQUIREMENTS
Strength requirement of the wall and ceiling:
The ceiling construction must be able to resist a withdrawal force of 70kg (154 pounds) at each of the three
attachment locations. Otherwise, some additional mounting supports must be used to fulfil this requirement.
The wall construction must be able to resist a shear load of 25kg (55 pounds) and a withdrawal force of 52kg
(115pounds) at each of the four attachment locations. Otherwise, some additional mounting supports must be
used to fulfil this requirement.
Temperature and humidity:
The operating temperature range is from +15°C to +3 5°C. The acceptable humidity range is from 15% to 8 5%.