![Deger DEGERtracker S60H CF Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/deger/degertracker-s60h-cf/degertracker-s60h-cf_assembly-and-operating-manual_2464968026.webp)
23.09.2015
ASSEMBLY AND OPERATING MANUAL DEGERtracker S60H CF
Page 26
1.
Insert the aluminum profile clamp in the lower channel
of the aluminum profile and push into the middle of the
aluminum profile.
2.
Place on the central pipe and fix the clamping part and
two M10 flange nuts.
Tightening torque: 40 Nm
It’s recommended to tighten the bolt connections during
assembly of the modules to have the possibility to adjust
the position of the aluminum profiles.
6.8
Assembly of the modules
ATTENTION!
After assembling the modules and finishing or interrupting the assembly work, the
module surface must be moved to and secured in horizontal (SAFE) position.
For the fastening of solar modules, DEGER supplies the aluminum profiles and standard fastening
materials. Specific fastening materials, which may possibly be prescribed by the module manufacturer
and the necessary information, are not part of the scope of delivery from DEGER.
The permissible
fastening of the modules must be clarified with the module manufacturer beforehand.
Please note
-
Check if aluminum profiles have been mounted pursuant to 6.7 of these instructions (protrusion same
on both sides)
-
Arrange modules symmetrically in line with the centre of the central pipe
Centre of gravity of the module surface