Lay the abutment soaker tight against the
wall face (as illustrated) positioned above the
felt support tray and then permanently fix to
the batten edge. Ensure that the abutment
soaker overhangs the fascia by the same
distance as the eaves course roof tile.
When the abutment soaker is secured, fit
the final starter rail as shown, screwing
through the abutment soaker.
Ensure that the edge of the eaves/bar
starter rail aligns with the edge of the
abutment soaker channel.
At the ridge apex, mitre the soaker as
illustrated.
Note: If more than 1 length of abutment
soaker is required, ensure that the 2
sections overlap each other by a distance of
at least 150mm.
After fixing the abutment soaker
correctly overlap/install the wall flashing
to make watertight, as illustrated.