At the gable ends slide a roof tile (first roof tile) into the
eaves/starter rail at the gable end as shown.
Simply position the end of the continuous dry verge unit
directly in line and flush with the bottom edge of the
overhanging roof tile and place the inner sleeve directly onto
the exposed batten ends that have been cut flush with the
gable roof edge.
Fix with 30mm stainless steel screws downwards into the top
of the battens making sure the dry verge unit is perfectly in
line with the verge.
Fix a bracket clip, if required, with screw fixings ENVDVB,
to join lengths of continuous dry fix verge when rafters are
longer than 3m in length.
At the apex centre mitre cut and abut to the continuous dry
verge unit to the correct pitch angle in readiness for the gable
end cap to be fixed.
Note: It is recommended that fascia board is used to
envelope/overlap the continuous dry verge at exposed gable
ends. This provides improved aesthetics as well as additional
protection against severe wind uplift.
To finish gable ends it is recommended that the continuous dry fix verge (ENV3MDV) is
used. This is fitted over the top of the battens and runs along the top edge of the end rafters
at gable ends. Use dry verge brackets (ENVDVB) to join lengths of dry verge if required.
10. DRY VERGE INSTALLATION
10
INSTALLING THE CONTINUOUS DRY VERGE
Fit dry verge to
edge of tile