248-624-7710 / dedoes.com
Alliance A7 Assembly Instruc�ons
P1615 RV.5 2022-05-20
E. Baffle and Thermometer Installa�on Instruc�ons
Step 1 - Once the units are assembled, adjust the interior vents. For best results, Dedoes recommends star�ng with the lowest vent
fully open, the central vents open one quarter, and the top vent fully closed.
Step 2 - While holding the vents in place, slide the baffle through the lances to completely cover the interior vent for each heated
unit. It may be necessary to use a straight blade screw driver to gently bend the four lances that hold the interior vents in
place. Be cau�ous as to not break the lances.
Step 3 - Once the baffles are installed and centered, press the lances firmly against the baffle to help secure each baffle into place.
Step 4 - Place one thermometer inside each of the heated units to the le� or right of the center post.
Step 5 - A�er 24 hours, adjust the vent posi�ons to be�er suit your preferred temperature.
Step 6 - If the desired temperature range cannot be obtained by adjus�ng the vents, adjust the temperature se�ng of the remote
thermostat. Do so by turning off the power to the unit, removing the remote thermostat cover, and using a screwdriver to
increase or decrease the temperature se�ng.
NOTE: Preferred temperatures may be unattainable when ambient temperature is below 6°C.
Bottle temperatures could range +/- 8° from each other.
Adjusting the openings in the vent covers will increase or decrease the unit temperature.
The baffles do not need to be adjusted, their location centered over each vent helps to distribute the heat to all areas of the unit.
Top Unit - Closed
Middle Units - 1/4 Open
Bottom Unit - Fully Open
Recommended Vent Settings