Instruction manual
Water treatment boiler system D 110 L
Seite 11
7.4 Cleaning sewage pump
Remove cover plate
Remove
hoses
Remvoe fastening screws of pressure switch.
ATTENTION: Do not alter the middle adjusting screw!
Remove fastening screws of pump head and take off the head
Cover plate
Hose
Hose
Fastening screw
Adjusting screw