background image

 

 

Instruction manual

 

 

Water treatment boiler system D 110 L 

 

 

 

 

 

 

Seite 14 

9 Declaration of conformity

 

 
 

 

 

 

 

 

 

EU Declaration of conformity 

deconta GmbH

 

Im Geer 20 
D-46419 Isselburg 
 

Product:

 Water treatment 

 

 

 

Typ:

 503 

 

The design of the unit complies with the  

EU-Maschine directive 2006/42/EG 

following regulations:

 

   EU-Low 

voltage 

directive 

2006/95/EG 

 
Applied harmonised standards:   

 

EN 292, EN 60335-1 

 

Applied national standards: 

 

 

DIN VDE 0701, DIN VDE 0702 

 

 

 A.Evers, Leitung Entwicklung 

   Isselburg, 

23.02.2011 

 

 
 

 
 
 
 

The copyright of this instruction manual remains the property of 

deconta

. This instruction 

manual is destined for the field service and survey personnel. It contains instructions and 
drafts of technical nature which must not be used completely or in extracts for the 
purpose of competition. It may not be distributed among others. 
 
 
 
 

 

For more information, please visit our website www.deconta.com. 

 

 

 

Содержание D 110L

Страница 1: ...Instruction manual Water treatment boiler system D 110 L Manufacturer deconta GmbH Im Geer 20 D 46419 Isselburg Description Water management D 110 L Type No 503 Serial No...

Страница 2: ...L Seite 2 Table of contents on page 1 Basic safety advice 3 2 Transport und storage 4 3 Volume of delivery 5 4 Technical description 5 5 Technical data 7 6 Initial operation 8 7 Maintenance and care...

Страница 3: ...n the event of non observance deconta assumes no liability To ensure safety during operation of the unit the following must be strictly observed Do not use in potentially explosive areas Necessary rep...

Страница 4: ...to avoid damages due to faulty handling or imprudence In winter and at risk of frost you have to empty the whole device pumps filter housings tank preliminary to the transport Attention Transport of...

Страница 5: ...o regulations During asbestos sanitation works within closed rooms you have to exclude that the asbestos fibres leave the sanitation area uncontrolled and endanger the human health and the environment...

Страница 6: ...9 10 11 12 13 14 15 16 17 0 10 20 30 40 50 60 70 80 90 100 0 77 0 97 1 22 1 54 1 93 2 44 3 07 3 87 4 87 6 14 7 74 9 75 12 3 15 5 19 5 24 6 30 9 Meas Point Diameter Effectiveness 1 0 77 84 3 2 0 97 90...

Страница 7: ...2000Watt Heatup phase 37 C with full tank approx 2 h Pumps 12 V 6 5 A Self priming and dry run safe Flow rate max 10 6 l min Fresh water supply automatic via fresh water connection or manually via fi...

Страница 8: ...ect to power supply Adjust temperature at heating rod the heating rod works at all switch settings of the function switch but not before a sensor controlled minimum fill level is reached At use of the...

Страница 9: ...hower water pump sewage pump and heating rod operative Safety advice During works on the device always disconnect the plug Operate the device only with mains which are secured with fault current prote...

Страница 10: ...ter change only if the device is switched off Demount dirty filters only in wet shape to avoid contamination Use only approved filters It is prohibited to use damaged filter candles Filter change Loos...

Страница 11: ...1 7 4 Cleaning sewage pump Remove cover plate Remove hoses Remvoe fastening screws of pressure switch ATTENTION Do not alter the middle adjusting screw Remove fastening screws of pump head and take of...

Страница 12: ...Instruction manual Water treatment boiler system D 110 L Seite 12 Take out valve plate and clean front and back Valve plate...

Страница 13: ...Instruction manual Water treatment boiler system D 110 L Seite 13 8 Circuit diagram...

Страница 14: ...ied harmonised standards EN 292 EN 60335 1 Applied national standards DIN VDE 0701 DIN VDE 0702 A Evers Leitung Entwicklung Isselburg 23 02 2011 The copyright of this instruction manual remains the pr...

Отзывы: