![Deckma Hamburg OMD-2005 Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/deckma-hamburg/omd-2005/omd-2005_instruction-manual_2461734023.webp)
DECKMA HAMBURG GmbH
Issue: 27.05.08
Instruction Manual OMD-2005
Page 23 of 25
14.0 CALIBRATION
15 ppm Bilge Alarms built according MEPC.107(49) have to be protected against
access beyond the checks of instrument drift, repeatability of the instrument
reading and zero adjustment. For this reason the instrument is electronically
sealed, so that only the manufacturer or his authorized persons, equipped with
the related tools, are able to get access for changing the calibration.
To provide a simple procedure for check the instrument aboard ship, the OMD-
2005 is constructed in that way, that the zero check also confirms the instrument
drift within the specifications.
14.1 Calibration and repeatability check
a) Switch off the power supply and stop any water flow.
b) Clean the sample tube accurate by using a suitable cell cleaning brush as
described under Section 12.0. Make sure, that the offset is correct at ± 0.
c) Run clean water through the instrument.
d) If it is sure, that non aerated, clean water is in the instrument, the reading
should be 0 ppm ± 2 ppm.
e) Continue as described under Section 11.0.
Note § 4.2.11 of MEPC. 107(49):
The accuracy of the 15 ppm Bilge Alarms should be checked at IOPP Certificate
renewal surveys according to the manufacturers instructions. Alternatively the
unit may be replaced by a calibrated 15 ppm Bilge Alarm. The calibration
certificate for the 15 ppm Bilge Alarm, certifying date of last calibration check,
should be retained onboard for inspection purposes. The accuracy checks can
only be done by the manufacturer or persons authorized by the manufacturer.
14.2 Function Test at Classification Survey and Port State Control
All 15 ppm Bilge Alarms leaving our works are calibrated according the
requirements with an accuracy of better than +/- 5 ppm within the measuring
range. The alarm points are pre-set to 15 ppm and can only be changed to a
lower value on site. A setting to a higher value is not possible.
To provide a simple procedure for check the instrument aboard ship, the OMD-
2005 is constructed in that way, that the zero check also confirms the instrument
drift within the specifications.
A function test for checking the correct installation, can easy be done by
changing the position of the 3 way valve. At the clean water position the unit will
be in alarm status.
StockCheck.com