5
3
1C
3
5
4
1B
1E
1D
4
3
3
3
1
2
Important - See page 4 for the dimensions
and notes
Note Hole Locations
Note Hole
Locations
Install the wall channel.
2A
1
2B
2C
2D
Start at the bottom and
work up with the
supplied roller tool.
Important: Seal must
be fully inserted.
Maximum
Install the fixed panel glass. There is a sticker to indicate
16mm
which side has the E
ZI
Clean coating. This side must go
on the inside of the shower.
Important: Leave the corner glass protectors on until the
last possible moment.