2.2 Mark a Position in the Rack
LKG–5636–91I
1. Position
template
3. Mark the position of the support
brackets and the DECNIS 600
unit in the rack
4. For the support brackets, repeat the procedure on the other 3 rails.
For the DECNIS 600 unit, repeat the procedure on the other front rail only
2. Match template to holes in rails.
Use:
Metric markings for metric racks
Imperial markings for imperial racks
2–2 Installing the DEC Network Integration Server 600
Содержание DECNIS 600
Страница 16: ......
Страница 18: ......
Страница 24: ......
Страница 34: ...2 10 Installing the DEC Network Integration Server 600...
Страница 35: ...LKG 5678 91I Rack Support brackets Installing the DEC Network Integration Server 600 2 11...
Страница 38: ......
Страница 60: ......
Страница 62: ......
Страница 78: ......
Страница 86: ...LKG 5663 91I 1 Loosen screws 2 Gently pull handles outwards 6 8 Installing Upgraded Processor or Memory Cards...
Страница 96: ......
Страница 108: ......
Страница 110: ......
Страница 120: ......
Страница 212: ......
Страница 227: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray Removing and Replacing Faulty Components 11 15...
Страница 232: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray 11 20 Removing and Replacing Faulty Components...
Страница 260: ......
Страница 262: ......
Страница 270: ......
Страница 275: ...Figure B 1 DECNIS 600 Physical Dimensions LKG 5704 91I Electrical Environmental and Physical Information B 5...
Страница 282: ......
Страница 284: ......
Страница 288: ...V Ventilation B 2 Vents 2 7 W WAN See Wide Area Network Wide Area Network xi Index 4...