Preparing to Install the System
This chapter describes the preparations you need to make before installing the
DECNIS 600.
1.1 Tasks
Follow the procedures in Sections 1.2 to 1.6 to:
1.
Plan a site for the DECNIS 600.
2.
Prepare a rack (or cabinet) for the DECNIS 600.
3.
Check that the site fulfills electrical requirements for the DECNIS 600.
4.
Check the contents of the kit.
5.
Check that you have the necessary tools available.
6.
Check that two or more people are available to lift the DECNIS 600 from
its packaging and into the rack.
1.2 Planning a Site
Before you start the installation, plan and prepare the site for the DECNIS
600 so that:
•
The site fulfills all electrical and environmental requirements for the
DECNIS 600. Appendix B describes these requirements.
•
A rack is available and all rack requirements are fulfilled. Section 1.3
describes these requirements.
•
The correct length of cabling is available for connecting the DECNIS 600 to
other equipment, for example, a modem.
•
The site can accommodate plans to expand the system. For example, if
you require a Network Interface Card that uses a distribution panel, you
should allow room for the distribution panel in the rack or in a rack nearby.
Preparing to Install the System 1–1
Содержание DECNIS 600
Страница 16: ......
Страница 18: ......
Страница 24: ......
Страница 34: ...2 10 Installing the DEC Network Integration Server 600...
Страница 35: ...LKG 5678 91I Rack Support brackets Installing the DEC Network Integration Server 600 2 11...
Страница 38: ......
Страница 60: ......
Страница 62: ......
Страница 78: ......
Страница 86: ...LKG 5663 91I 1 Loosen screws 2 Gently pull handles outwards 6 8 Installing Upgraded Processor or Memory Cards...
Страница 96: ......
Страница 108: ......
Страница 110: ......
Страница 120: ......
Страница 212: ......
Страница 227: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray Removing and Replacing Faulty Components 11 15...
Страница 232: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray 11 20 Removing and Replacing Faulty Components...
Страница 260: ......
Страница 262: ......
Страница 270: ......
Страница 275: ...Figure B 1 DECNIS 600 Physical Dimensions LKG 5704 91I Electrical Environmental and Physical Information B 5...
Страница 282: ......
Страница 284: ......
Страница 288: ...V Ventilation B 2 Vents 2 7 W WAN See Wide Area Network Wide Area Network xi Index 4...