11.4.9 Final Checks
Before powering up the system, make sure that:
•
All cards are seated correctly and connected to the backplane assembly.
•
All communications cables are installed correctly. Refer to the Cabling
Instructions and Specifications card for details.
11.5 Backplane
Complete the procedures in Sections 11.5.1 to 11.5.16 to remove and replace
the backplane.
Removing and Replacing Faulty Components 11–31
Содержание DECNIS 600
Страница 16: ......
Страница 18: ......
Страница 24: ......
Страница 34: ...2 10 Installing the DEC Network Integration Server 600...
Страница 35: ...LKG 5678 91I Rack Support brackets Installing the DEC Network Integration Server 600 2 11...
Страница 38: ......
Страница 60: ......
Страница 62: ......
Страница 78: ......
Страница 86: ...LKG 5663 91I 1 Loosen screws 2 Gently pull handles outwards 6 8 Installing Upgraded Processor or Memory Cards...
Страница 96: ......
Страница 108: ......
Страница 110: ......
Страница 120: ......
Страница 212: ......
Страница 227: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray Removing and Replacing Faulty Components 11 15...
Страница 232: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray 11 20 Removing and Replacing Faulty Components...
Страница 260: ......
Страница 262: ......
Страница 270: ......
Страница 275: ...Figure B 1 DECNIS 600 Physical Dimensions LKG 5704 91I Electrical Environmental and Physical Information B 5...
Страница 282: ......
Страница 284: ......
Страница 288: ...V Ventilation B 2 Vents 2 7 W WAN See Wide Area Network Wide Area Network xi Index 4...