![DCN DCRS-9800 Series Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/dcn/dcrs-9800-series/dcrs-9800-series_install-manual_517070054.webp)
DCRS-9800 InstallManual Chapter 2 Hardware Installation
2-14
cleaning on a regular basis according to the site conditions.
z
Loosen the 2 panel fasteners in the dust gauze
z
Draw the dust gauze out smoothly by holding the 2 screws
z
Clean the dust gauze with a brush (never wash with any liquid)
z
Insert the gauze back to its original position in the switch
z
Tighten the panel fasteners.
Note: The dust gauze is installed on switch chassis shipment.
The installation and removal of the dust gauze is shown below:
Fig 2-3 Installation and removal of the DCRS-9808 dust gauze
Содержание DCRS-9800 Series
Страница 4: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 2 Fig 1 2 DCRS 9816 Switch...
Страница 9: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 7 Fig 1 3 DCRS 9808 Module Outlook...
Страница 10: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 8 Fig 1 4 DCRS 9808 Front Panel View...
Страница 14: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 12 Fig 1 5 DCRS 9816 Module Outlook...
Страница 15: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 13 Fig 1 6 DCRS 9816 Front Panel view...
Страница 51: ...DCRS 9800 InstallManual Chapter 2 Hardware Installation 2 11 Fig 2 2 Rack mounting DCRS 9816...