![DCN DCRS-9800 Series Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/dcn/dcrs-9800-series/dcrs-9800-series_install-manual_517070034.webp)
DCRS-9800 InstallManual Chapter 1 Product Overview
1-32
The DCRS-9816’s dust gauze lies under the board rack and prevents large particles
in the air from entering the switch. The dust gauze should be inserted from the front of the
DCRS-9816 in a horizontal position.
Fig 1-16 DCRS-9816 Dust Gauze Outlook
1.4.8 Rear Panel
1.4.8.1 DCRS-9808 Rear Panel
The rear panel of the DCRS-9808 covers the switch backplane. There are two
reversible handles on the rear panel, they are used only for the installation and removal of
the rear panel. Notice, the two fan disc handles are not for carrying the switch box. The
rear panel is shown below:
Содержание DCRS-9800 Series
Страница 4: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 2 Fig 1 2 DCRS 9816 Switch...
Страница 9: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 7 Fig 1 3 DCRS 9808 Module Outlook...
Страница 10: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 8 Fig 1 4 DCRS 9808 Front Panel View...
Страница 14: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 12 Fig 1 5 DCRS 9816 Module Outlook...
Страница 15: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 13 Fig 1 6 DCRS 9816 Front Panel view...
Страница 51: ...DCRS 9800 InstallManual Chapter 2 Hardware Installation 2 11 Fig 2 2 Rack mounting DCRS 9816...