DCN DCRS-9800 Series Скачать руководство пользователя страница 1

DCRS-9800 InstallManual                                            Content 

 

Content 

CHAPTER 1 PRODUCT OVERVIEW .........................................1-1

 

1.1

 

P

RODUCT 

B

RIEF

.................................................................................1-1

 

1.1.1 Introduction ........................................................................................... 1-3

 

1.1.2 Main Features........................................................................................ 1-3

 

1.2

 

T

ECHNICAL SPECIFICATIONS

.................................................................1-4

 

1.3

 

P

HYSICAL 

S

PECIFICATIONS

..................................................................1-5

 

1.4

 

H

ARDWARE 

C

OMPONENTS

...................................................................1-5

 

1.4.1 Chassis .................................................................................................. 1-5

 

1.4.2 Introduction to DCRS-9800 Series Cards ......................................... 1-15

 

1.4.3 Interface description........................................................................... 1-26

 

1.4.4 Power supply ...................................................................................... 1-27

 

1.4.5 System Backplane .............................................................................. 1-29

 

1.4.6 Fan Tray ............................................................................................... 1-29

 

1.4.7 Dust Gauze .......................................................................................... 1-31

 

1.4.8 Rear Panel ........................................................................................... 1-32

 

1.4.9 Side Panels.......................................................................................... 1-34

 

1.5

 

S

YSTEM 

F

EATURES

...........................................................................1-37

 

1.5.1 DCRS-9808 System Features ............................................................. 1-37

 

1.5.2 DCRS-9816 System Features ............................................................. 1-37

 

CHAPTER 2 HARDWARE INSTALLATION ...............................2-1

 

2.1

 

B

ASIC 

R

EQUIREMENTS

........................................................................2-1

 

2.1.1 Site Requirements ................................................................................ 2-1

 

2.1.2 Temperature and Humidity Requirements .......................................... 2-1

 

2.1.3 Dust and Particles................................................................................. 2-2

 

2.1.4 Preventing Electrostatic Discharge Damage...................................... 2-3

 

2.1.5 Anti-interference Requirements........................................................... 2-3

 

2.1.6 Rack Configuration............................................................................... 2-3

 

2.1.7 Power Supply Requirements ............................................................... 2-4

 

2.2

 

S

AFETY 

G

UIDELINES

...........................................................................2-5

 

2.3

 

S

AFETY 

W

ARNING

...............................................................................2-5

 

2.4

 

H

OT 

L

INE 

W

ORK 

S

AFETY 

G

UIDELINES

..................................................2-5

 

2.5

 

P

REPARING FOR 

I

NSTALLATION

.............................................................2-6

 

2.5.1 Checking Switch Hardware Configuration and Accessories ............ 2-6

 

2.5.2 Required Tools and Utilities................................................................. 2-7

 

2.6

 

H

ARDWARE 

I

NSTALLATION

...................................................................2-8

 

2.6.1 Switch Installation ................................................................................ 2-8

 

2.6.2 Switch grounding................................................................................ 2-12

 

2.6.3 Card and module installation............................................................. 2-13

 

2.6.4 Connecting to the Console ................................................................ 2-21

 

2.6.5 Connecting to the Management Port ................................................ 2-21

 

Содержание DCRS-9800 Series

Страница 1: ...1 37 CHAPTER 2 HARDWARE INSTALLATION 2 1 2 1 BASIC REQUIREMENTS 2 1 2 1 1 Site Requirements 2 1 2 1 2 Temperature and Humidity Requirements 2 1 2 1 3 Dust and Particles 2 2 2 1 4 Preventing Electrosta...

Страница 2: ...DCRS 9800 InstallManual Content 2 2 6 6 SFP transceiver installation 2 21 2 6 7 Copper Cable Fiber Cable Connection 2 22 2 6 8 Power supply connection 2 23...

Страница 3: ...hapter 1 Product Overview 1 1 Chapter 1 Product Overview RECOMMENDATION Please read this manual first before using the switch following the instructions to avoid damaging the device 1 1 Product Brief...

Страница 4: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 2 Fig 1 2 DCRS 9816 Switch...

Страница 5: ...r systems are used to realize the POE function of boardcards in this series And most components of DCRS 9800 Series Routing Switches interchangeable including main control management modules service b...

Страница 6: ...1 2 Technical specifications Protocols and Standards IEEE802 3 10BASE T Ethernet IEEE802 3u 100BASE TX FX Fast Ethernet IEEE802 3x Flow control IEEE802 1x access control IEEE802 1D w Spanning Tree IEE...

Страница 7: ...S 9816 1800W Max Operating Temperature 0 C 45 C Storage Temperature 40 C 70 C Relative humidity 10 90 with no condensate Dimension DCRS 9808 436mm 708mm 450mm W x H x D DCRS 9816 436mm 842mm 450mm W x...

Страница 8: ...slots Users can change the 8 slots for short cards into 4 slots for full card by removing the horizontal beams in slots for short cards The power area locates on the right side of the frame including...

Страница 9: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 7 Fig 1 3 DCRS 9808 Module Outlook...

Страница 10: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 8 Fig 1 4 DCRS 9808 Front Panel View...

Страница 11: ...is only on main control module in M1 or M2 the switch works in single main control mode When two main control modules are slotted in the working mode becomes dual main control mode A board power indic...

Страница 12: ...ult If the temperature exceeds a secure threshold the main control module will set the fan at high speed Such intellectual control of fans not only reduces noise but also saves energy which means a gr...

Страница 13: ...nd POE power system separately used for system power and POE power allowing at most four power modules The power modules insert into the power slots from the front A grounding post has been provided o...

Страница 14: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 12 Fig 1 5 DCRS 9816 Module Outlook...

Страница 15: ...DCRS 9800 InstallManual Chapter 1 Product Overview 1 13 Fig 1 6 DCRS 9816 Front Panel view...

Страница 16: ...work interface modules the underside slots sequenced as 1 to 8 from left to right the upside slots sequenced as 9 to 16 from left to right The box of a DCRS 9816 switch supports the full card mode the...

Страница 17: ...justment of air speed and air volume according to the monitored temperature inside the box to save energy and reduce noise There are three different fan speeds high middle low If the temperature insid...

Страница 18: ...dundancy 1 4 2 1 1 Front Panel The MRS 9800 MI comes with 1 CF card port 1 Console port control console 1 10 100Base Tx Ethernet port management port and a reset key The Front Panel view is shown belo...

Страница 19: ...g in accordance with the power it relates to Indication Light Meaning Status Description On green The power module is in position and works normally On red The power module is in position but works ab...

Страница 20: ...ator Off The line card is absent 8 CF STATUS the indicator for the status of CF cards Indication Light Meaning Status Description On green The CF card is in position Succeed in linking the Ethernet ma...

Страница 21: ...RS 9800 MI provides a RJ 45 receptacle Ethernet port Users can connect through this management port to hosts for program loading or to connect to remote devices for remote management e g a managing wo...

Страница 22: ...f the board Indication Light Meaning Status Description On Green Card powered PWR power indicators Off Card powered off 2 Run the running status indicators of the board Indication Light Meaning Status...

Страница 23: ...odule is in position and works normally On red The power module is in position but works abnormally POWER POE indicators for the POE power status Off The power module is absent 6 FAN Fan trays status...

Страница 24: ...nagement ports Indication Light Meaning Status Description green blink Data are being transmitted ACT Managing data transmission on the port Off No data transmission On green Succeed in linking the Et...

Страница 25: ...1 4 2 2 5 Front Panel Reset Button MRS 9808 M provides a RESET button for resetting the board 1 4 2 3 MRS 9800 24GB 24 port 1000Mbps optical line card MRS 9800 24GB Implements 2 layer and 3 layer wir...

Страница 26: ...terfaces too 1 4 2 4 MRS 9800 24GT 24GT electronic interface line card MRS 9800 24GT to implement the layer2 and layer3 wire speed exchange and routing function of 24 10 100 1000Base T electronic inte...

Страница 27: ...XFP implements 2 layer and 3 layer wire speed switching and routing function of 4 10 000Mbps XFP interfaces and IPv6 wire speed transmission 1 4 2 5 1 Front Panel Diagram MRS 9800 4XFP is the short ca...

Страница 28: ...RJ 45 receptacle Console serial ports and 10 000Mbps XFP electric interfaces DCRS 9800 series provide this types of SFP z SFP SX L Gigabit SFP MM 850 nm 500m SX z SFP LX L Gigabit SFP SM 1310 nm 10Km...

Страница 29: ...er 1310nm 9 125um single mode fiber 20Km z SFP LX 40 transceiver 9 125um single mode fiber 40Km z SFP LH 70 L transceiver 9 125um single mode fiber 70Km z SFP LH 120 L transceiver 9 125um single mode...

Страница 30: ...odules fix themselves with the bayonets connector on them to the boxes each controlled by a power control switch Please turn on both control switches to make the powers operate normally The power modu...

Страница 31: ...pply for controlling the power output of control module Please turn the switch to right for normal operation 1 4 5 System Backplane The system board of DCRS 9800 serial switch is located inside the sw...

Страница 32: ...andle at the front panel of the fan disc for connecting or disconnecting the disc MRS 9808 FAN Outlook as follow Fig 1 13 MRS 9808 FAN Outlook 1 4 6 2 DCRS 9816 Fan Tray The fan tray for DCRS 9816 MRS...

Страница 33: ...4 7 1 DCRS 9808 Dust Gauze The DCRS 9808 s dust gauze lies under the board rack and prevents large particles in the air from entering the switch The dust gauze should be inserted from the front of th...

Страница 34: ...he front of the DCRS 9816 in a horizontal position Fig 1 16 DCRS 9816 Dust Gauze Outlook 1 4 8 Rear Panel 1 4 8 1 DCRS 9808 Rear Panel The rear panel of the DCRS 9808 covers the switch backplane There...

Страница 35: ...re safe operation of the switch please do not open the rear panel The removable dust screen at the bottom of the backplane can be displaced for cleaning Notice do not clean it with water There are two...

Страница 36: ...iew 1 34 Fig 1 18 DCRS 9816 Rear Panel View 1 4 9 Side Panels 1 4 9 1 DCRS 9808 Side Panels There are rows of air inlets holes at the bottom of each side of the DCRS 9808 switches and rows of ventilat...

Страница 37: ...ventilation openings and ensure that enough clearance is left on both sides of the switch for air circulation Failure to do so can cause the chassis to overheat and the system to fail or damage to com...

Страница 38: ...hown above Fig 1 20 DCRS 9816 Side Panels View Please do not block the ventilation openings and ensure that enough clearance is left on both sides of the switch for air circulation Failure to do so ca...

Страница 39: ...cessor Status indicator Port Traffic LINK General Power status system status hot swap indicator Weight 65KG Max full configuration weight Physical Dimensions 436mm 708mm 450mm W x H x D Relative humid...

Страница 40: ...tus indicator Port Traffic LINK General Power status system status hot swap indicator Weight 80KG Max full configuration weight Physical Dimensions 436mm 842mm 450mm W x H x D Relative humidity 10 90...

Страница 41: ...ditioning is recommended in areas with high temperatures in the summer z To cool the internal circuits the switch comes with internal fan assemblies To maintain proper air circulation through the swit...

Страница 42: ...the switch rack with no protective panel covering the front and rear of the rack Short term working conditions refer to a maximum of 48 hours of continued operation and an annual cumulative total of...

Страница 43: ...ty 4 Always wear an ESD wrist strap and antistatic uniform when in contact with circuit boards 2 1 5 Anti interference Requirements All sources of interference whether from the device system itself or...

Страница 44: ...an level desktop leave a clearance of 100mm around the switch for ventilation and do not place anything on top of the switch 2 1 7 Power Supply Requirements The DCRS 9800 is designed to use modular sw...

Страница 45: ...8 Do not perform any operation that may result in bodily injury or damage to the device 9 When cleaning the switch do not use a damp cloth to wipe the switch and never wash the switch with liquids 2 3...

Страница 46: ...the event of an accident take the following measures Measure1 Power down the system Measure2 Make emergency calls if required Measure3 Determine whether the victim requires immediate treatment and ta...

Страница 47: ...EM No Part name Number Memo 1 DCRS 9816 Ethernet Switch 1 2 AC cable 3 3 Serial port cable 1 4 Grounding cord 1 5 Chassis hanger 2 6 Hanger screw 12 8 Manual CD 1 9 Qualification certificate 1 10 Warr...

Страница 48: ...lation Install the SFP transceiver in the SFP slot XENPAK transceiver installation Install the XENPAK transceiver in the XENPAK slot Copper Cable Fiber cable connection Ethernet cable connection Fiber...

Страница 49: ...l not be able to mount into a standard rack Note that the hangers are not weight bearing They are used to fasten the switch The mounting Shelf or sliding rails bolt to the rack will support the switch...

Страница 50: ...DCRS 9800 InstallManual Chapter 2 Hardware Installation 2 10 The procedure is shown below Fig 2 1 Rack mounting DCRS 9808...

Страница 51: ...DCRS 9800 InstallManual Chapter 2 Hardware Installation 2 11 Fig 2 2 Rack mounting DCRS 9816...

Страница 52: ...ower source the device must be grounded with the green and yellow ground cables otherwise shock hazards may occur when insulation resistance between the internal power supply and the chassis degrades...

Страница 53: ...nd Installing the Cards The installation procedure is the same for all cards as shown below Step 1 Power down the switch Hot swapping is supported by optional cards for the switch However for better c...

Страница 54: ...st gauze out smoothly by holding the 2 screws z Clean the dust gauze with a brush never wash with any liquid z Insert the gauze back to its original position in the switch z Tighten the panel fastener...

Страница 55: ...an be serviced from the back The installation and removal of the fan tray is relatively simple There are slip tracks in the fan tray To install just hold the fan tray in the correct slip tracks align...

Страница 56: ...2 16 press the locker slightly down and the fan tray can be drawn out smoothly Note The fan trays are installed on switch chassis shipment The installation and removal of a fan tray is shown below Fig...

Страница 57: ...6 employs a 3 1 redundant power supply module combination all three modules will work during normal operation In case one module fails it can be replaced while the system is operating without presenti...

Страница 58: ...y and smoothly Step 4 Turn the switch in the front panel of the new power supply module to the left use the new power supply module and replace the failed module Tighten the panel fasteners in the fon...

Страница 59: ...DCRS 9800 InstallManual Chapter 2 Hardware Installation 2 19 Fig 2 7 The installation and removal of DCRS 9808 power supply modules...

Страница 60: ...DCRS 9800 InstallManual Chapter 2 Hardware Installation 2 20 Fig 2 8 The installation and removal of DCRS 9816 power supply modules...

Страница 61: ...ernet interface for program loading or use this port to connect to remote devices e g an administrative workstation for remote administration The connection procedure is listed below z Connecting to a...

Страница 62: ...port in the switch copper cable line card Step 2 Insert the other end of the Ethernet cable into the RJ 45 Ethernet port of the other device Step 3 Check all status indicators for the corresponding p...

Страница 63: ...he power supply socket and another end into the corresponding socket of the switch when connecting electrical lines it shall be confirmed that the power supply modules are power off Step 2 It shall be...

Отзывы: