
4. Installation
The installation must be performed by qualified personnel and equipped with protective clothing. Daze
Technology srl assumes no responsibility for any damage to the device resulting from failure to comply
with the instructions provided.
If the installation is not explicitly covered by the DazeTechnology srl sales contract, we will be pleased to
assist you in finding a qualified installer.
Do not make arbitrary changes to the device. Repairs may only be carried out by the manufacturer or by
specialized personnel.
Do not remove safety symbols, danger warnings, cable labels or tags.
Warning!
If it is raining or snowing and DazeBox is located outdoors, do not open the device. Wait for the charging
cycle to be completed and for the vehicle to be disconnected before opening the device.
4.1. Supply
Inside the packaging is supplied:
●
DazeBox with Type 2 cable of 3 or 5 meters. The 5 version is equipped with a cable holder.
●
Installation, use and maintenance manual (this document).
●
Resistance kit
●
Screws and dowels
4.2. Transport and storage
The machine parts are protected with a bubble wrap and sealed with adhesive tape. The whole is placed in a
cardboard box.
Do not place loads on the box. On the box there are clearly visible signs with indications of the type in figure
3.
Figure 3.
Pictograms on the packaging. From the left: Do not place loads on the box; Do not overturn; Tall.
After storage and transport to the place of installation and immediately before installation, prepare the
machine by removing it from the box and removing the packaging sheet.
9
ENG - June 2020 - Rev. 1