Dip switch
Power
management
Corrente max
Potenza max 1F
Potenza max 3F
1
2
3
4
A
kW
kW
0
0
0
0
PM OFF
6,500
1,5
4,5
0
0
0
1
PM OFF
8,000
1,8
5,5
0
0
1
0
PM OFF
13,000
3,0
9,0
0
0
1
1
PM OFF
16,000
3,7
11,1
0
1
0
0
PM OFF
19,000
4,4
13,2
0
1
0
1
PM OFF
22,000
5,1
15,2
0
1
1
0
PM OFF
26,000
6,0
18,0
0
1
1
1
PM OFF
32,000
7,4
22,2
Table 6.1.
Table for selecting the power of the Wallbox.
The number zero "0" refers to a dip switch positioned downwards (referring to figure 7), while the number
one "1" refers to a dip switch positioned upwards.
Power management system setting.
The installation of power management involves connecting the current transformer to the electric meter. In
order to complete the installation, a 0.5 mm shielded bipolar cable must be procured. It has to be long
enough to to connect the current transformer from the electric meter to the DazeBox. The amperometric
ring must be inserted on the line cable at the output of the general meter before each branch as shown in
figure 8.
Figure 8. Amperometric ring positioned under the meter
.
The amperometric ring, already equipped with a 30 cm cable, must be connected to the shielded bipolar
cable.
Once the shielded bipolar cable has been brought to the DazeBox, pass it through the specific PG shown in
figure 9.
14