DazeBox (V5.1)
Installation, use and maintenance manual
1
ENG - June 2020 - Rev. 1
Страница 1: ...DazeBox V5 1 Installation use and maintenance manual 1 ENG June 2020 Rev 1...
Страница 2: ...atures 5 3 Use 8 3 1 Intended use 8 3 2 Unintended use 8 4 Installation 9 4 1 Supply 9 4 2 Transport and storage 9 4 3 Preliminary checks 10 4 4 General Criteria for selecting the place of installatio...
Страница 3: ...in compliance with current safety regulations Therefore the product does not normally entail any danger to people or things The machine and its components are designed in such a way that they cannot...
Страница 4: ...electrical equipment is located degrading the insulating materials The degree of protection of the machine is IP54 that is the environment of use must be clean in the absence of dust or vapors 1 4 War...
Страница 5: ...of safety and also for its ability to deliver high currents The control circuit also provides for the communication between the charging station and the vehicle through the PWM Pulse Width Modulation...
Страница 6: ...Figure 1 DazeBox charging station and its external components Figure 2 Dimensions of the DazeBox charging station 6 ENG June 2020 Rev 1...
Страница 7: ...re range at 32 A from 25 C to 45 C without direct exposure to sunlight Protection degree IP54 There are three types of DazeBox for three different recharging powers in accordance with customer needs M...
Страница 8: ...stand by awaiting charging The status of the LEDs is pulsed green To charge the vehicle pull out the charging cable by always holding it by the plug and never by the cable itself and connect it to th...
Страница 9: ...ait for the charging cycle to be completed and for the vehicle to be disconnected before opening the device 4 1 Supply Inside the packaging is supplied DazeBox with Type 2 cable of 3 or 5 meters The 5...
Страница 10: ...nstall the device in places at risk of explosion EX environment used as escape routes where objects can fall eg hanging stairs or car tires in which it is possible that it is hit by jets of water unde...
Страница 11: ...nting on the wall with relative dimensions of the DazeBox with 3 meter cable For Dazebox with 5 meter cable and cable holder refer to figure 5 Figure 5 Depiction of mounting on the wall with relative...
Страница 12: ...r edge of the plate figure 4 for the 3 meter cable version 1200 1500 mm with respect to the lower edge of the plate figure 5 for the 5 meter cable version Mark the three holes using a drilling templat...
Страница 13: ...current chosen must be suitable for the circuit breaker and the fuse The earth connection is ensured by the user s system The device does not have its own electric grid switch The differential switch...
Страница 14: ...agement system setting The installation of power management involves connecting the current transformer to the electric meter In order to complete the installation a 0 5 mm shielded bipolar cable must...
Страница 15: ...erly stripped and that the shielding is well in contact with the earth terminal Figure 10 Power management wiring Once the electrical connection is complete the current can be adjusted Using the curre...
Страница 16: ...onnection wires to the appropriate length The wires must be as short as possible 2 Remove approximately 12 mm of insulation from the connection wires For thin connection wires it is recommended to use...
Страница 17: ...rt 2 The measuring instruments used must comply with national regulations eg DIN EN 60557 VDE 0413 Electrical safety in low voltage grids up to AC 1000V and DC 1500V 3 Measurement results must be docu...
Страница 18: ...absence of national regulations manufacturers recommend checking each month Acting on the test button the device must intervene immediately Otherwise contact your trusted technician because the safet...
Страница 19: ...ror state Each error is associated with a corresponding number of short consecutive flashes In case of error contact support Numero lampeggi Errore 2 Temperature to high 5 Error on vehicle side 6 Gene...
Страница 20: ...nce with the regulations in force in the country of use Decommissioning and disposal of the product When the equipment is disposed of all components and materials must be identified and separated to a...