DAYLIFF DS Скачать руководство пользователя страница 11

9

7.  MAINTENANCE

Ÿ

In order to obtain maximum pump life the number of starts should be controlled 
and should not exceed 30 per hour. It is also necessary to start the pump at least 
monthly to prevent seizure.

Ÿ

No regular maintenance is required though periodically, recommended every 3 
months, the installation should be inspected to check operating parameters 
including running current, water output, closed head pump pressure and water 
quality as well as switchgear condition. Rectification should be carried out as 
necessary. Interpretations of various operating problems are given in the Fault 
Finding Guide. 

Ÿ

Also important is a periodic check of motor winding and insulating resistance, 
especially if there is an abnormal operating current or voltage reading. For three 
phase  motors  winding  resistance  between  each  pair  of  phases  should  not 
exceed 10%. For insulating resistance a satisfactory reading is >100MOhm 
and if below this some deterioration in motor winding insulation, cable integrity 
or cable joint security is indicated. Generally it is satisfactory to keep running the 
motor until resistance drops to below 0.5MOhm when the equipment should be 
removed and checked.

Ÿ

As  a  rule  periodic  lifting  and  checking  of  borehole  installations  is  not 
recommended until an operating fault is noted as equipment is designed for 
continuous operation for an indefinite period.

Содержание DS

Страница 1: ...Installation Operating Manual DS DSP D3SP Submersible Borehole Pumps...

Страница 2: ...otors Three Phase Motors 4 INSTALLATION Pump Application Pump Position Pump Lowering 5 PUMP OPERATION 6 MAINTENANCE 7 TROUBLE SHOOTING 8 WARRANTY 9 2 DELIVERY STORAGE Delivery Storage Handling 1 1 2 2...

Страница 3: ...sheet which will be supplied with the pump DAYLIFF D3SP pumps are compact 3 diameter submersible multistage centrifugal pumps specifically designed for small scale water supplies from boreholes and we...

Страница 4: ...ii Motor All pumps are fitted with sealed liquid cooled oil filled 2 pole asynchronous squirrel cage motors constructed principally of stainless steel Single phase motors require purpose designed con...

Страница 5: ...t Leakage at this joint will cause motor failure Care must be taken when fitting the motor tail cable to the motor The connection between the tail cable and the motor should be lubricated with a non c...

Страница 6: ...in the form of an MCB or fuse Coarse current rating should be approx 3X maximum rated motor current For all three phase motors and single phase motors above 1 1kW a DOL starter is required Note that...

Страница 7: ...entification of the start run and common windings is essential or else the motor will burn out Extra care must therefore be taken when connecting and if in doubt the pump supplier should be consulted...

Страница 8: ...and 35m for D3SP Pumped liquid should be clean thin and non explosive containing no solid 3 particles or fibres Sand content should not exceed 50gm m or else pump life will be reduced and any warrant...

Страница 9: ...ecommended that the complete pump is submerged at least 3m the dynamic water level and if possible the pump should be installed at least 3m from the bottom of the borehole to prevent silting damage As...

Страница 10: ...o approximately 1 3 of its maximum volume of water Observe if there are impurities in the water and then gradually open the valve until the water is observed to be clear If the water continues to be s...

Страница 11: ...e Fault Finding Guide Also important is a periodic check of motor winding and insulating resistance especially if there is an abnormal operating current or voltage reading For three phase motors windi...

Страница 12: ...al call service technician Motor starter contactor defective Repair the motor starter contactor The control circuit has been interrupted or is defective Check the electric installation No electricity...

Страница 13: ...the strainer Replace or repair the pump The valves in the discharge pipes are partly closed or blocked Check and clean or replace the valves and discharge pipe Wrong direction of rotation Change direc...

Страница 14: ...lve changed Pull out the pump and clean or replace the non return valve The non return valve is leaking or stuck half open Long period until water flow after start Increase the installation depth of t...

Страница 15: ...warranty condition or liability implied by law the liability of Davis Shirtliff hereafter called the Company in respect of any defect or failure of equipment supplied is limited to making good by rep...

Страница 16: ...INS 278C 08 18...

Отзывы: