Содержание STHC-B-ISG02DB-03
Страница 13: ...Step 1 Open the cover of the iConnector Step 2 Connect the Configuration Cable to the UART Port in iConnector ...
Страница 19: ...Install the sensor as shown below 6 2 IO Wiring Sensor installation ...
Страница 20: ...Step 1 Open the back cover of the sensor Step 2 Wiring to sensors ...
Страница 21: ...Step 3 Connect Sensor to Input 4 20mA port of iConnector via M12 connector ...