background image

13

Specifications

G e n e r a l :

Cellular Bands. . . . . . . . . . . . . . . . . . . . . . . 850, 900, 1800, 1900 MHz
Operating Temperature.  . . . . . . . . . . . . . . . -40° to +140°F (-40° to +60°C) 
Charging Temperature  . . . . . . . . . . . . . . . . -4° to +120°F (-20° to +49°C)
Storage Temperature  . . . . . . . . . . . . . . . . . -40° to +140°F (-40° to +60°C) 
Current Draw. . . . . . . . . . . . . . . . . . . . . . . . 25mA typical, 1A peak

GPRS class 10: 146mA typical

Transmitter Power . . . . . . . . . . . . . . . . . . . . 2W @ 850/900 MHz (Class 4) 

1W @ 1800/1900 MHZ (Class 1) 

Housing Material . . . . . . . . . . . . . . . . . . . . . Rugged ASA Plastic
Dimensions (width x length x height) . . . . . . 13.75 X 10 X 4.15 inches

(34.9 X 25.4 X 10.5 cm)

Weight  . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8.14 lbs. (3.69 kg)

Battery  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 volt, 12 Ah, gel cell with quick 

disconnect 0.250” x 0.032” (6.35 
mm x 0.81 mm) tabs 

Dimensions without tabs  . . . . . . . . . . . . . . 5.95” L x 3.70” H  x 2.00” D; 

151 mm L x 98 mm H x 51 mm D

Certifications:

. . . . . . . . . . . . . . . . . . . . . . . . . . FCC   PTCRB   CE   Carrier 

Appendix: Using AC Power to Charge the 
Battery

If your installation is in a low-light area or an area with prolonged periods of time 
where temperatures stay  below -4°F (-20°C), charging may be inhibited. You may 
use  Davis’s Optional AC Charger Kit, product number 6710, to charge the battery. 
The kit allows you to replace the solar charger with AC power. The adapter has a 
universal input (100 -240V, 50-60 Hz) and will work anywhere in the world. (A 
wall-plug adapter may be necessary for use in some countries.) In a cold 
environment, you will need to bring the Vantage Connect into a warmer 
environment (above -4°F/-20°C) to charge the battery with the AC Charger Kit.

Содержание Vantage Connect

Страница 1: ...tage Pro2 Vantage Pro2 Plus Vantage Vue and Weather Envoy Product number 6620 R Vantage Connect USER MANUAL Davis Instruments 3465 Diablo Avenue Hayward CA 94545 2778 U S A 510 732 9229 www davisnet c...

Страница 2: ...e following standards have been applied 1 Health Article 3 1 a of the R TTE Directive Applied standard s EC recommendation 1999 519 EC 2 Safety Article 3 1 a of the R TTE Directive Applied standard s...

Страница 3: ...lable in different packages depending on country of use Contents of Package The package contains the following Vantage Connect in weather proof shelter with 5 watt solar panel WeatherLink software CD...

Страница 4: ...see your Davis reseller or purchase a plan during your registration process on WeatherLink com After purchase you will receive an e mail with an Activation Code that you will use to register online Re...

Страница 5: ...Measure Enter the transmitter ID number of each of the transmitters that will be reporting to your Vantage Connect up to 8 Choose a station type for each For example Vantage Pro2 ID 1 Leaf and Soil Mo...

Страница 6: ...lick Clear Selected Data or if no erroneous data has accumulated click Cancel 4 My Account Enter your account information Enter your City State Country and latitude longitude Enter a name for your sta...

Страница 7: ...nd the battery Before proceeding with installation make sure the main power cable is disconnected from the main power jack Connect the battery The Vantage Connect is shipped with one battery cable the...

Страница 8: ...mportant that the shelter be mounted so that the solar panel gets the greatest amount of sunshine the solar shelter should be facing south in the northern hemisphere or north in the southern hemispher...

Страница 9: ...ing remove power from the Vantage Connect register then repower 1 If using Vantage Connect with a cabled ISS remove the plug from one of the holes in the bottom of the shelter Run the ISS cable up thr...

Страница 10: ...Connect is registered on the network powered up and connected to both signals it will begin uploading the latest data to the server Data is uploaded to your page on WeatherLink com along with daily hi...

Страница 11: ...on on using the features of WeatherLink software Configure Alarm E mail When an alarm condition is triggered the alarm appears on your WeatherLink com summary page You can also set up e mail alarms fo...

Страница 12: ...Make sure status LED is showing normal function otherwise the device has not registered on the network See above to test LEDs Check power to the weather station Make sure all cables are securely plugg...

Страница 13: ...or in getting a signal the status LEDs will flash to indicate the type of error For example if the cell status LED lower is flashing and the top LED blinks two times pauses then blinks two times repea...

Страница 14: ...nt to move if possible Blinks red a specific number 3 to 10 of times There is a cell error The number of red flashes indicates the error code number Contact Tech Support and report the error code Rapi...

Страница 15: ...nsions without tabs 5 95 L x 3 70 H x 2 00 D 151 mm L x 98 mm H x 51 mm D Certifications FCC PTCRB CE Carrier Appendix Using AC Power to Charge the Battery If your installation is in a low light area...

Страница 16: ...use harmful interference to radio or television reception which can be determined by turning the equipment on and off the user is encouraged to try to correct the interference by one or more of the fo...

Отзывы: