background image

6  

 

© 2020 Davis Packaging : DPM39-0320ARef 

Basic Wrapping Technique 

P: 800.622.3015 / 561-290-0412  □  E-mail: [email protected] 

www.davispackaging.net 

 

 

 

 

7. Place left hand on top right side edge of 
bundle to hold secure. Use right hand to pull 
right side of film out to straighten, then up and 
over top of bundle. Pull less for delicate linens 
to avoid wrinkles. 

 

8. Repeat using opposite hands to finish left 
side of bundle. 

 

   

   

Seal Option 1: Hot Plate 

Flip bundle over and place 
folded seams on hot plate until 
fully sealed. Adjust thermostat 
knob so bundle can sit without 
melting holes in film and seams 
are secure. 

 

Seal Option 2: Hand Iron 

Use iron as necessary to tack 
all bundle seams.  Iron should 
be hot enough to weld film to 
itself without melting holes in 
film. 

 

Finished Bundle 

Seams should be tack welded 
to the point that a finger nail 
across the seam will not 
separate or easily open. Raise 
thermostat heat if easily pealed 
open or lower if melt holes exist. 

Содержание M39

Страница 1: ...watts Accessory Outlet 15amp 43 86 W x 12 1 D x 7 96 H 25 lbs HP912 Hot Plate optional Seals wrapped bundle Adjustable thermostat Replaceable Teflon cover 9 x 12 seal area 5 ft power cord 115v 6 5 amp...

Страница 2: ...ng Rod Film Rollers Adjustable Feet x 6 Guard Lever Anti Burn Guard Film Retainer Rod Accessory Outlet 15A 125v Accessory Fuse 15A Hot Rod Fuse 2A Power Switch Film Roll D Ring Film Stop x 2 Electrica...

Страница 3: ...ST Hand Iron www davispackaging net Seal Option Part Reference P 800 622 3015 561 290 0412 E mail contact davispackaging net Thermostat Dial Power Switch Heat Element Fuse 6 25A Power Cord Thermostat...

Страница 4: ...t excess film and create a clean start line 5 Adjust Film Tension Screw H until a slight drag is felt when pulling film to prevent film roll from over spinning and sticking to itself Loosen Film Tensi...

Страница 5: ...o work area Do not cut film from roll 2 Place bundle face down on top of film For cleanest finished appearance Face up if not a concern 3 Bring front edge of film up and over the bundle to the back ed...

Страница 6: ...te hands to finish left side of bundle Seal Option 1 Hot Plate Flip bundle over and place folded seams on hot plate until fully sealed Adjust thermostat knob so bundle can sit without melting holes in...

Страница 7: ...r Switch Hot Rod Fuse 2A Accessory Outlet Power Cord Service Panel Panel Retaining Screws x Electrical Service Panel Caution Unplug unit before removing Service Panel to avoid electrical shock Electri...

Страница 8: ...er does not show continuity replace 2 Amp fuse 2 Test the Cutting Rod Neon Circuit Tester Remove Electrical Service Panel With the power OFF disconnect red wire from Circuit Board Terminal 1 and secur...

Страница 9: ...ay test Electrical Outlet Wiring and Terminal Block Check Outlet Connections Remove Electrical Service Panel With power OFF visually inspect all wiring from Terminal Block to Fuse to Outlet to ensure...

Страница 10: ...Cutting Rod After rod has fully cooled blow or brush film debris from unit Deep Cleaning Cutting Rod of Burnt Film TURN OFF UNPLUG THE UNIT AND LETTHE MACHINE COOLDOWN BEFORE CLEANING Cover the unit...

Страница 11: ...net Replacement Parts 1818 001 Circuit Control Board 1821 013 Fuse Holder 1824 020 Hot Rod Cut Off 43 25 Inches Long CR4325 1872 009 Lighted Rocker Switch 1875 055 Wiring Terminal Block 1845 011 Acces...

Страница 12: ...ge A Return Authorization RA number and shipping address will be provided in order for the failed part to be returned for evaluation Return shipping costs must be prepaid and shipped within 30 days of...

Отзывы: