8
For installations 21kW and over
Installing into main filtration system
Installing into existing solar heating system
1) The frame must be fixed by bolts (M10) to concrete foundation or brackets. The concrete foundation must
be solid and fastened; the bracket must be strong enough and antirust treated;
2) Please ensure 50cm of clearance around each side of the Davey heat pump or the efficiency of the heat
pump will be reduced;
3) Although a bypass system is not necessary for your Davey heat pump to operate properly, we strongly
recommend the installation of a bypass system to regulate the flow rate and make the maintenance and
winterising of the Davey heat pump easier.;