TANKS FOR FLUID FEEDING
The PT series DAV Tech tanks are ideal to feed in the best way the valve
DAS 90. They are available in 3 sizes 2, 5 and 10 liters and in different
variations. Made of mirror polished stainless steel and aluminum, all tanks
can be equipped on request with an electrical minimum level sensor.
DRIVE THE VALVE DAS 90
The valve DAS 90 have to be drived with a 3/2 solenoid valve, timed by the customer. The atomizing air, necessary
for the spraying,have to be drived with another 3/2 solenoid valve with a precision pressure regulator mounted on the
line. This allows to keep separate the timing of dosing and spraying, and allow to have the greatest possible results.
We reserve the right to modify at any time, without notice, the specifications, dimensions and weights in this datasheet. The illustrations are not binding.
DAS 90 _ _ RM
NOZZLES AVAILABLE
Special versions available on request.
Connection diagram
Valve configurations
AIR PRESSURE
REGULATOR
BLUE TUBE
BLACK TUBE
FLUID
PLC
PLC
E.V.
3/2
E.V.
3/2
E.V.
3/2
PRESSURIZED
TANK
• 0.5
• 0.8
• 1
• 1.2
• 1.5
Ø
mm
2.3 Connection
diagram
3 INSTALLATION
3.1 Mounting in the machine
The DAS 90 valve must be mounted using the fixing plate on the valve.
A good valve fixing on the machine must be guaranteed, stable
without vibration and with good accessibility for adjustment, cleaning
and maintenance.
3.2 Drive the valve
The DAS 90 spray valve must be operated by two separate solenoid valves; a 3/2 way for the pilot (black tube) and a
3/2 way for the nebulization (blue tube).
The operating pressure must be between 5 and 7 bar.
The nebulization between 0,1…2.5 bar.
The atomizing air must be activated before and closed after the operating air, this to prevent the glue from dirtying the
nozzle and the cap.
3.3 Fluid connections
The valve must be connected to a fluid supply unit (pressure drum or diaphragm pump).
The material pipe is the transparent 6x4 diameter.
Fastening hole
Manuale DAS 90
3
INSTALLAZIONE
3.1
Montaggio della Valvola
La Valvola DAS 90 deve essere montata
utilizzando la piastra di fissaggio presente
sulla Valvola.
Deve essere garantito un buon fissaggio della
Valvola sulla macchina, stabile senza
vibrazioni e con una buona accessibilità per
la regolazione, la pulizia e la manutenzione.
3.2
Azionare la Valvola
La Valvola spray DAS 90 deve essere azionate da due elettrovalvole
separate; una da 3/2 vie per il pilotaggio (tubo nero) e una da 3/2 vie per
la nebulizzazione (tubo blu).
La pressione di azionamento deve essere compresa tra 5 e 7 bar.
La pressione di nebulizzazione tra 0,1…2.5 bar.
L’aria di nebulizzazione deve essere attivata prima e chiusa dopo l’aria di
azionamento, questo per impedire che la colla possa sporcare l’ugello e il
cappuccio.
3.3
Collegamento del materiale
La Valvola deve essere collegata ad un gruppo di alimentazione colla
(fusto sotto pressione o pompa a membrana).
Il tubo del materiale è quello trasparente di diametro 6x4.
DAV Tech Sas Via S. Pio X 6/a 36077 Altavilla Vicentina (VI) 0039 0444 574510 www.davtech.it [email protected]
6
Foro di fissaggio
Tempo aria di nebulizzazione
Tempo aria di apertura
Installation and maintenance guide
Spraying air time
Opening air time