background image

 

 

Chapter 3 Installation 

3.1 INSTALLATION NOTIC 

-Improper installation will cause damage to machine or personnel. We do not take responsibility to any direct or 

indirect damage due to improper installation or operation. 

-The  proper  installation  floor  should  be  level,  to  ensure  level  lifting  and  lowering.  Any  slant  can  affect  the 

performance of the machine. 

-Forbid to install the machine on asphaltum floor. According to the floor requirement, can only install machine 

on good condition concrete floor, no crack and

 

other defects

.

 

-Without certify permit from architect, forbid to install machine on the floor which has empty room downstairs. 

-Avoid installing machine near warming device, water faucet, air humidifier and ingle. 

-Power supply: Before installation, get ready for the power supply.

   

 

3.2 INSTALLATION PROCESS 
3.2.1 GENERAL ORIENTATION 

-Lift can only be installed on concrete with steel to reinforce.   

Thickness of concrete ≥ 200mm

to ensure the intensity reach to 3000PSI

2.1Kg/mm

2

upwards

 

-Height of indoor should be over 4000 mm

regard to hold enough space for all lifting vehicles(approximate 4m 

from the lift center) 

-Distance from post to wall should be at lease 1200mm. In case of emergency situation or working convenience, 

should consider about enough space for safety channel. 

 
3.2.2 FLOOR LAYOUT 

It’s very important for the floor layout (picture 3). If it’s not correct, there may be some 
problems during installation and operation. The total level error is less than 4mm, which 
can decrease the problems during final installation. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Picture 3 (floor layout) 

Содержание LJCC2045A

Страница 1: ...1 TWO POST LIFT LJCC2045A U Us se er r s s m ma an nu ua al l Manufacturer ...

Страница 2: ...2 MANUFACTURE AND SERVICE AGENT TWO POST LIFT Model Serial no Manufacture date Manufacture Name Address Telephone Fax http E mail AUTHORIZED SERVICE CENTRE ...

Страница 3: ...est on nameplate only professional electrician is allowed to connect the power Forbid to load vehicle over 4500KG Read the warning content in user s manual carefully We do not take responsibility to the damage due to improper use or operation Manufacturer owns the right to make little changes for the manual owing to the improvement of technology CATALOGUE Catalogue 1 Packing 2 Description of machi...

Страница 4: ...mported hydraulic and electrical components from Italy Germany and Japan 2 3 MAIN FABRIC PRINCIPLE Lifting fabric Each post has one cylinder when pump the oil into the cylinder the cylinder pole will move upwards to hold the carriage move upwards Support fabric After driving the vehicle into the working area adjust the angle of arms and length of extension arms to ensure the arms support on the ef...

Страница 5: ...re orientation device on the arms to lock arms when they are in proper position which can prevent the vehicle from slipping Chapter 2 Description of machine 2 4 CONFIGURATION DRAWING Picture 1 dimension drawing ...

Страница 6: ...6 Chapter 2 Description of machine Picture 2 arm extension drawing ...

Страница 7: ... Lifting time 50S Lowering time 60S Pass width 2390mm 3120mm Overall width 3440mm 5100 mm Overall weight 870 kg Voltage AC 400V or 230V 5 50Hz Machine power 2 2 KW Hydraulic oil 13L 20 high abrasive hydraulic oil prepared by user Working temperature 5 40 Working humidity 30 95 Noisy level 76db Installation height Height above sea level 1000M Storage temperature 25 55 Installation place Indoor ...

Страница 8: ...device water faucet air humidifier and ingle Power supply Before installation get ready for the power supply 3 2 INSTALLATION PROCESS 3 2 1 GENERAL ORIENTATION Lift can only be installed on concrete with steel to reinforce Thickness of concrete 200mm to ensure the intensity reach to 3000PSI 2 1Kg mm2 upwards Height of indoor should be over 4000 mm regard to hold enough space for all lifting vehicl...

Страница 9: ...at the moment 2 Check and ensure the posts dimension is in accordance with picture 5 Test the vertical of post with spirit level construction using type 3 2 5 ORIENTATION OF CROSSBEAM 1 Fix the crossbeam according to the drawing That side with limit switch should be installed on the post with hydraulic unit then fasten with screw 2 Fasten the expansion bolt Notice Select suitable steel shim as gas...

Страница 10: ...and 2 and tighten the cable with cable clip See picture 8 and picture 9 Important notice Correct standard of unlocking adjustment is as follow When nut of electromagnetic steel core is at the end see picture 9 two safety boards strike close to the carriage to lock the carriage effective When the nut of electromagnetic steel core is at the root of thread two safety boards can open together and carr...

Страница 11: ...th bolt Connect the wires according to electrical diagram and air loop according to air loop diagram Only authorized qualified personnel can install the electrical part Open the control box cover first Power connection Connect the 3 phase five wires 3 2 5mm2 2 1 5 mm2 for the power supply to the terminal of control box according to the circuit diagram If for 230V connection connect to the control ...

Страница 12: ...tensile force of two steel cables If not adjust the cable nut Press UP button to check whether the lifting and lowering of carriage is synchronized If not adjust the cable nut 4 4 LOADING TEST To check whether hydraulic system works normally when loading heavy weight Notice Check every oil pipe and fitting to ensure no leakage before operating the lift Use all the arms when lifting vehicle on the ...

Страница 13: ...heck the contact point of the button and wires connection and exclude When lifting operation the motor runs but it is no lifting movement The motor turns reverse Exchange the phases of the power supply wires lifting with light load is normal but no lifting with heavy load The set safe pressure of the over flow valve may be increased by turning the set knob right ward slightly The spool of the lowe...

Страница 14: ...ston to move Overflow valve is closed and the pressure is been set before packing in factory to ensure the maximum loading of lift When the system pressure is over max pressure overflow valve will work to have the oil back to oil tank Release UP button motor stops to wok and carriages stop lifting Press DOWN button to connect the electromagnetic steel and open the safety rack pump begins to have o...

Страница 15: ...15 7 2 EXPLODED DRAWING OF MAICHINE ...

Страница 16: ...16 Circuit diagram 220V ...

Страница 17: ...17 Circuit diagram 380V ...

Отзывы: