PQRM5100 11 Ux Ix xx xx (PS)
16
20200205-V1
5.5. Connecting the measuring inputs
to symmetrical
three-phase power network with
neutral conductor.
(3 phase, 4 wire, 1 measuring)
The following figure shows the wiring plan to symmetrical
three-phase network. Measuring only one phase. The three
phase outputs are calculated values. The measuring
arrangement use for the measurement of rotating
machinery!
Wiring plan, connecting
the voltage and current
inputs to power network.
The application of:
The vectorsum of all phase
voltages is always zero!
The terminal “k” of CT and
terminal “v” of VT you have
to connecting to earth!
1. Loosen terminal screws.
2. Insert the wire ends into the open terminals according to
the wiring plan.
3. Screw the terminal in.
4. Check the hold of the wires in terminals by pulling on
them firmly.
Checking the
connections
Check if the cables are connected properly (have you
connected all the cables, have you connected to the right
place, do not the cable-ends touch each other).
Содержание PQRM5100 11 U I Series
Страница 1: ...PQRM5100 11 Ux Ix xx xx PS Single Phase power transmitter Instruction manual...
Страница 76: ...PQRM5100 11 Ux Ix xx xx PS 76 20200205 V1 9 2 Application examples...
Страница 77: ...PQRM5100 11 Ux Ix xx xx PS 20200205 V1 77...
Страница 78: ...PQRM5100 11 Ux Ix xx xx PS 78 20200205 V1 RS485 bus topology...
Страница 79: ...PQRM5100 11 Ux Ix xx xx PS 20200205 V1 79...
Страница 80: ......