background image

8

 

 

2.

 

Assemble the left bracket to the wall plate with two 

M5x20 nickel 

plated hex socket cap screws

 as shown in the diagram below.  

 

3.

 

Assemble the right bracket to the wall plate with two 

M5x20 nickel 

plated hex socket cap screws

 as shown in the diagram below.  

 

 

 

 

Содержание WM-11

Страница 1: ...WM 11...

Страница 2: ...information However Datavideo Technologies cannot exclude that some information in this manual from time to time may not be correct or may be incomplete This manual may contain typing errors omission...

Страница 3: ...rranty from the date of purchase Damage caused by accident misuse unauthorized repairs sand grit or water is not covered under warranty Viruses and malware infections on the computer systems are not c...

Страница 4: ...r household waste Instead it is your responsibility to dispose of your waste equipment by handing it over to a designated collection point for the recycling of waste electrical and electronic equipmen...

Страница 5: ...on The assembled mount can support up to a 10 Kg load Note WM 11 is designed for PTR series of robotic pan tilt heads and PTC series of PTZ cameras Parts Assembly and Installation In this section you...

Страница 6: ...to the dimensions indicated in the diagram below Then follow the procedure in the next section to assemble and install the WM 11 Procedure The diagram below is an exploded view drawing of WM 11 and th...

Страница 7: ...hen use four expansion bolts to secure the wall plate See the diagram below Please note that you can use the bubble level meter to make sure that the wall plate is properly aligned If the bubble is at...

Страница 8: ...t to the wall plate with two M5x20 nickel plated hex socket cap screws as shown in the diagram below 3 Assemble the right bracket to the wall plate with two M5x20 nickel plated hex socket cap screws a...

Страница 9: ...own in the diagram below 5 Use four M2 5 screws to mount two bubble level meters to the base plate with one in the front and one at the bottom Insert the base plate between the left and right brackets...

Страница 10: ...ate is properly aligned i e the bubble is at the center The inner rails on the right and left brackets should allow you to move the base plate back and forth Note The base plate may be inserted in an...

Страница 11: ...place it on the base plate of the WM 11 such that the four screw holes at the bottom of the PTR 10 10T base are aligned with the screw holes found in the base plate as indicated in the diagram below S...

Страница 12: ...12 If after installation the PTR 10 10T vibrates you may enhance the installation by securing the base with four M3 x 8mm screws The additional screw holes are depicted in the diagram below...

Страница 13: ...wall mount Note The ceiling bracket and four pieces of the M4 screws are standard accessories of PTC 150 To mount the PTC 150 on the WM 11 use four M4 screws to secure each of the upper and lower pla...

Страница 14: ...14 Mount the PTC 150 to the WM 11 as shown in the diagram below...

Страница 15: ...olutions If problem still exists please contact your distributor or the service center No Problems Solutions 1 PTR 10 10T vibrates after installation If after installation the PTR 10 10T vibrates you...

Страница 16: ...16 Dimensions and Weight Unit mm Weight 3 95 Kg 8 70 lb Maximum load 50 Kg...

Страница 17: ...odel No WM 11 Name Professional Wall Mount for Robotic Pan Tilt Head Weight 4 kg Dimensions 424 x 230 x 125 mm Max Load 50 kg Applicable Products PTR 10 series PTC 140 series PTC 150 series PTC 280 se...

Страница 18: ...18 Notes...

Страница 19: ...19 Notes...

Страница 20: ...https www datavideo com product WM 11 G09112250503 Apr 01 2021 Ver E2 Datavideo Technologies Co Ltd All rights reserved 2020...

Отзывы: