InstallatIon and operatIon 9
INSTALLATION
STANDALONE
place the unit flat. the base is the side of the unit showing the serial number and dataton logo.
IN 19-INCH RACK
two WatCHpaX 4 units may be joined together and inserted into a 19-inch rack.
IMportant: the two units are attached with brackets at the front. the rack must therefore be
equipped with a shelf at the back to support the units.
•
Using a hex key, remove the rubber bumpers on both units and retain the screws. save the bumpers
in case you wish to re-mount them at a later date.
•
place the two units side-by-side and join them along the center line with the connection discs. Using
the screws from the bumpers, first mount two discs on the top of the units. Carefully turn the unit over
and mount the remaining two discs along the center line on the underside of the units.
•
IMportant: always mount all four discs to ensure the units are safely joined together.
•
Mount the two rack brackets (or ears) on the front corners of the joined units. these can be fitted
facing forward or backward, depending on the airflow, and cabling.
OPERATION
POWER ON
there is no on/off switch on a WatCHpaX 4. the unit is turned on by inserting the power cord.
note: the first time you power up the unit, WatCHpaX 4 will initiate an installation routine which
typically takes about five minutes to complete.
POWER OFF
Unplug the power cord to turn off the unit.
WAKE-ON-LAN
WatCHpaX 4 supports Wakeonlan which enables users to remotely power on a computer or to
wake it up from sleep mode by a network message from WatCHoUt or WatCHnet. please see
WatCHoUt and WatCHnet user guides for more information.
Connection discs,
four in total
Содержание Watchpax 4
Страница 1: ...1 3 ...